Additional floor in Kuwait - Qortuba

Additional floor in Qortuba

Adding a floor to a Qortuba villa starts with precise structural and foundation assessment because these villas are large with high loads. We evaluate each structural element and determine if reinforcement is necessary before new construction.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Qortuba villas are relatively modern and spacious, standing on large plots with wide setbacks, mostly designed originally for two or three floors. If a villa is already two storeys, adding a third requires checking the reinforced footings and main columns. We use non-destructive testing to confirm rebar diameter and depth, and if reinforcement is needed we add concrete jacket columns around existing columns or expand the footing pads.

Qortuba is located in the Capital governorate and is known for its upscale residential villas with generous setbacks.

Upscale villas in Qortuba typically require special municipality approval when changing the building's total height.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Qortuba

Call now
Can a third floor be added to a two-storey Qortuba villa?

Yes, if the foundations and columns were designed for it. We test the strength and depth, and if needed we add concrete jackets around columns or expand the footings.

Does adding a floor affect the setbacks and exterior boundaries of the plot?

No, the new floor is built directly above the existing structure with the same footprint. However, the total height must not exceed the municipality limit, which we verify before permit application.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works