Additional floor in Kuwait - Rawda

Additional floor in Rawda

Additional-floor projects in Rawda involve residential houses with deep foundations and sandy soil rich in organic matter. We carefully assess the existing structure, test the soil, and design a safe addition that does not compromise the original building's stability.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Rawda is a quiet, tree-rich residential district where most houses date from the 1990s and 2000s. The soil is sandy but contains high levels of organic matter due to vegetation, requiring precise load testing. Foundations are typically quite deep to bypass the organic layer. When adding a floor, we take extra soil samples and calculate expected settlement. Houses are fairly close together, so side protection for shared walls is needed during excavation and pouring.

Rawda is located in Capital governorate, a green residential district known for its parks and tree-covered spaces.

The organic layer in Rawda extends to about 2 metres, and foundations must either penetrate it or bear on solid sand below.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Rawda

Call now
Does the organic matter in Rawda's soil affect the additional-floor foundation?

Yes, it must be bypassed. The organic layer is soft and prone to settlement. We design piles or deep foundations to descend below it to solid sand, with precise testing before design.

Do trees and vegetation delay or affect construction?

Very close trees may need trimming or removal, but most are distant from new foundations. We review the site plan and carefully plan excavation to avoid damage to nearby roots.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works