Additional floor in Kuwait - Shuaiba Industrial

Additional floor in Shuaiba Industrial

Adding a new floor to an industrial structure in Shuaiba requires precise structural assessment of existing columns and footings before any new load. We evaluate the current frame's capacity and design the additional supports and beams needed to carry it safely.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most industrial buildings in Shuaiba are reinforced concrete with deep foundations and strong columns, but ages range from thirty to fifty years. Before adding a floor, we dig test pits to check the footing condition and soil settlement, and core existing concrete to test its strength. Shuaiba is humid and near petrochemical plants, so chemical attack may have weakened the concrete; we test for acidity and sulphates before proceeding.

Shuaiba Industrial lies in Ahmadi governorate, home to the KIPIC petrochemical complex and dozens of warehouses and heavy-equipment workshops.

We verify the strength of existing concrete by coring samples and laboratory testing before approving the new floor load.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Shuaiba Industrial

Call now
How do you confirm the footing can support an extra floor?

We dig test pits beside the footing to see its depth, soil condition and any settlement, and run heavy-duty soil probing to measure density. The results guide the new support design.

Is chemical attack a real issue for older buildings in Shuaiba?

Yes, the industrial setting and high humidity accelerate concrete decay from sulphates and salts. We always test existing concrete for deterioration before applying any new load.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works