Additional floor in Kuwait - Fahad Al-Ahmad

Additional floor in Fahad Al-Ahmad

Adding a new floor to a house in Fahad Al-Ahmad starts with inspecting the foundation, existing frame and column loads. We establish whether safe construction of the new storey is possible within building code and municipality approval standards.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most houses in Fahad Al-Ahmad are two-storey family dwellings on plots of 500 to 800 square metres, many built decades ago to older structural standards. Before adding a third floor, we inspect original design drawings and foundation and column materials to confirm they can carry the extra load. Older foundations often need reinforcement or strengthening before the frame rises, requiring special municipality approvals and geotechnical testing.

Fahad Al-Ahmad sits in Ahmadi governorate, a family residential district with houses on relatively spacious plots and private gardens.

We verify the original building permit and setback requirements before submitting the additional-floor application to the municipality.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Fahad Al-Ahmad

Call now
Can you add a storey to a house built 30 years ago?

Possibly yes. We inspect the foundation and columns first with geotechnical testing. If they can handle the added load, we reinforce them and build the new floor with municipality approval.

How long does municipality approval take for adding a floor?

It depends on the completeness of structural and geotechnical drawings and reports. Review and approval typically take 4 to 8 weeks after submission.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works