
Additional floor in Fahad Al-Ahmad
Adding a new floor to a house in Fahad Al-Ahmad starts with inspecting the foundation, existing frame and column loads. We establish whether safe construction of the new storey is possible within building code and municipality approval standards.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most houses in Fahad Al-Ahmad are two-storey family dwellings on plots of 500 to 800 square metres, many built decades ago to older structural standards. Before adding a third floor, we inspect original design drawings and foundation and column materials to confirm they can carry the extra load. Older foundations often need reinforcement or strengthening before the frame rises, requiring special municipality approvals and geotechnical testing.
Fahad Al-Ahmad sits in Ahmadi governorate, a family residential district with houses on relatively spacious plots and private gardens.
We verify the original building permit and setback requirements before submitting the additional-floor application to the municipality.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Fahad Al-Ahmad
Questions about Additional floor in Fahad Al-Ahmad
Call nowCan you add a storey to a house built 30 years ago?
Possibly yes. We inspect the foundation and columns first with geotechnical testing. If they can handle the added load, we reinforce them and build the new floor with municipality approval.
How long does municipality approval take for adding a floor?
It depends on the completeness of structural and geotechnical drawings and reports. Review and approval typically take 4 to 8 weeks after submission.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps