Additional floor in Kuwait - Bidaa

Additional floor in Bidaa

Adding a storey in Bidaa requires inspecting the existing building's structural frame and assessing whether it can safely carry one more level. We oversee all reinforcement and pouring stages from start to handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Houses in Bidaa are often older and built to less stringent standards than current codes, ranging from small villas to low-rise apartment buildings. Adding a storey demands comprehensive review of existing foundations, columns, and beams, plus fresh load calculations for the combined structure. We often have to modify or reinforce shallow foundations and add support columns inside or under existing ones. Municipality coordination requires detailed drawings of both old and new frames plus an approved structural report from a consulting engineer.

Bidaa is in Hawalli governorate near the Salmiya seafront, an older residential area.

We test the original foundation depth and concrete thickness to determine if additional reinforcement is needed.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Bidaa

Call now
Does adding a floor require deep excavation under the existing foundation?

Not always. We first inspect the existing foundation depth, and if it is deep and strong, we may add new columns without deep excavation. If foundations are shallow or weak, we excavate and reinforce them.

How long from structural inspection to starting the actual building work?

Inspection, calculations, and drawings take two to three weeks, then municipality approval takes an additional one to two weeks before excavation begins.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works