Additional floor in Bidaa
Adding a storey in Bidaa requires inspecting the existing building's structural frame and assessing whether it can safely carry one more level. We oversee all reinforcement and pouring stages from start to handover.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Houses in Bidaa are often older and built to less stringent standards than current codes, ranging from small villas to low-rise apartment buildings. Adding a storey demands comprehensive review of existing foundations, columns, and beams, plus fresh load calculations for the combined structure. We often have to modify or reinforce shallow foundations and add support columns inside or under existing ones. Municipality coordination requires detailed drawings of both old and new frames plus an approved structural report from a consulting engineer.
Bidaa is in Hawalli governorate near the Salmiya seafront, an older residential area.
We test the original foundation depth and concrete thickness to determine if additional reinforcement is needed.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Bidaa
Questions about Additional floor in Bidaa
Call nowDoes adding a floor require deep excavation under the existing foundation?
Not always. We first inspect the existing foundation depth, and if it is deep and strong, we may add new columns without deep excavation. If foundations are shallow or weak, we excavate and reinforce them.
How long from structural inspection to starting the actual building work?
Inspection, calculations, and drawings take two to three weeks, then municipality approval takes an additional one to two weeks before excavation begins.
Licensed and registered in Kuwait.