Additional floor in Kuwait - Mubarak Al-Abdullah

Additional floor in Mubarak Al-Abdullah

Adding a floor in Mubarak Al-Abdullah suburb requires complete engineering assessment of the building and safe design of the new frame. We oversee the entire project from evaluation through final handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mubarak Al-Abdullah suburb contains detached houses and small apartment buildings of varying age and design. When adding a new floor, we start with thorough inspection of the foundation, columns, beams, and existing concrete, reviewing original building files if available. Load calculations account for the added weight and lateral forces from wind and earthquakes. We may add new support columns, reinforce foundations, or redesign the beam system. Every step is documented carefully and submitted to the municipality for formal approval before any excavation or pouring.

Mubarak Al-Abdullah is in Hawalli governorate, a residential suburb with contemporary suburban character.

We ask the owner to obtain the ownership certificate and original drawings from the municipality before structural inspection begins.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Mubarak Al-Abdullah

Call now
If the building is old, can a floor be added without demolition and reconstruction?

In most cases yes. We inspect the frame carefully, and if it is sound and stable, we add the new floor with necessary reinforcement. Demolition is a last resort only if the structure is severely compromised.

Who is responsible for obtaining the building permit for the additional floor?

We prepare the drawings and engineering studies with a consulting engineer, but the owner applies for the permit at the municipality. We assist in following up the file and providing any documents the authority requests.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works