
Additional floor in Mubarak Al-Abdullah
Adding a floor in Mubarak Al-Abdullah suburb requires complete engineering assessment of the building and safe design of the new frame. We oversee the entire project from evaluation through final handover.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Mubarak Al-Abdullah suburb contains detached houses and small apartment buildings of varying age and design. When adding a new floor, we start with thorough inspection of the foundation, columns, beams, and existing concrete, reviewing original building files if available. Load calculations account for the added weight and lateral forces from wind and earthquakes. We may add new support columns, reinforce foundations, or redesign the beam system. Every step is documented carefully and submitted to the municipality for formal approval before any excavation or pouring.
Mubarak Al-Abdullah is in Hawalli governorate, a residential suburb with contemporary suburban character.
We ask the owner to obtain the ownership certificate and original drawings from the municipality before structural inspection begins.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Mubarak Al-Abdullah
Questions about Additional floor in Mubarak Al-Abdullah
Call nowIf the building is old, can a floor be added without demolition and reconstruction?
In most cases yes. We inspect the frame carefully, and if it is sound and stable, we add the new floor with necessary reinforcement. Demolition is a last resort only if the structure is severely compromised.
Who is responsible for obtaining the building permit for the additional floor?
We prepare the drawings and engineering studies with a consulting engineer, but the owner applies for the permit at the municipality. We assist in following up the file and providing any documents the authority requests.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps