
Additional floor in Salwa
Adding a floor in Salwa begins with reviewing the original building file and calculating loads on the existing foundation and columns. We develop a comprehensive reinforcement plan before erecting any new formwork for pouring.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Salwa is a residential district of homes on medium-sized plots, most built three storeys high with conventional concrete frames from the 1980s and 1990s. Adding a fourth storey means checking the building's age and the concrete and steel condition, because older structures often have foundations designed only for three floors. We test concrete samples from the existing foundations and columns, then prepare a reinforcement study that may include foundation injection or installing auxiliary columns before pouring the new level.
Salwa is in Hawalli governorate, a traditional residential district near Mishref Park and Salam Co-op.
Most residential buildings in Salwa have exterior walls 30 centimetres thick, which we account for in load calculations.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Salwa
Questions about Additional floor in Salwa
Call nowCan we add a storey to an older building from the 1980s?
Yes, but we inspect concrete and steel condition first. If the building is sound we reinforce columns by adding steel; if the foundation is weak we may need injection or auxiliary columns.
How long does foundation inspection and building reinforcement take?
Inspection takes two to three weeks, reinforcement four to six weeks depending on scope. The new storey pour then follows immediately after.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps