Additional floor in Kuwait - Ministries Area

Additional floor in Ministries Area

Adding a floor in the Ministries Area requires careful assessment of the existing structure and approvals from competent government agencies before raising any new frame. We handle assessment, design and construction with full coordination with the relevant authorities.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ministry and government buildings in this area are typically strong-framed with thick beams to carry heavy administrative loads, often built in the sixties and seventies to strict standards. Adding a floor means a full review of the electrical, drainage and central ventilation systems. These buildings also need approvals from the Civil Service Commission and Public Works, and may require temporary closure during work.

The Ministries Area lies in Hawalli governorate near the Kuwait Government Ministries Complex, housing formal and administrative offices with strict building standards.

We require written approval from the Civil Service Commission before starting any structural work on a government building.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Ministries Area

Call now
What approvals are needed to add a floor to a ministry or government building?

We need approvals from the Civil Service Commission, the Municipality and Environmental Affairs, and Public Works. We handle the application tracking and submission of engineering drawings required by each agency until final approval.

Can the extra floor be built without shutting down the entire building?

It may be possible if the design allows isolating the work area from the other floors. However, most government projects require temporary closure of the affected section at least to ensure staff safety.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works