
Additional floor in Ministries Area
Adding a floor in the Ministries Area requires careful assessment of the existing structure and approvals from competent government agencies before raising any new frame. We handle assessment, design and construction with full coordination with the relevant authorities.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Ministry and government buildings in this area are typically strong-framed with thick beams to carry heavy administrative loads, often built in the sixties and seventies to strict standards. Adding a floor means a full review of the electrical, drainage and central ventilation systems. These buildings also need approvals from the Civil Service Commission and Public Works, and may require temporary closure during work.
The Ministries Area lies in Hawalli governorate near the Kuwait Government Ministries Complex, housing formal and administrative offices with strict building standards.
We require written approval from the Civil Service Commission before starting any structural work on a government building.

What the work covers
Structural assessment through new-floor handover, handled as one coordinated job

Second-floor addition
New floor built over an existing ground storey with full structural tie-in

Third-floor addition
Extra storey above two existing floors after load-bearing verification

Ground-floor construction
Full ground floor built as a planned base for future upper additions

Rooftop floor addition
Floor added above the existing roof slab with load and waterproofing checks

Rebar tie-in to columns
Drilled epoxy-anchored dowels into existing columns for the new frame

Insulation and finishing
Roof thermal insulation, interior finishing and facade work for the new floor
How it works.
First contact
Call or WhatsApp us with the villa details and required floor count
Site assessment
Site visit to inspect the existing frame and assess column capacity
Drawings and permit
We prepare approved addition drawings and follow up the municipality permit
Structural build
Rebar tie-in, column and slab pours, block walls and roof insulation
Handover
Final inspection and handover with the required completion documents
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Additional floor
Other services in Ministries Area
Questions about Additional floor in Ministries Area
Call nowWhat approvals are needed to add a floor to a ministry or government building?
We need approvals from the Civil Service Commission, the Municipality and Environmental Affairs, and Public Works. We handle the application tracking and submission of engineering drawings required by each agency until final approval.
Can the extra floor be built without shutting down the entire building?
It may be possible if the design allows isolating the work area from the other floors. However, most government projects require temporary closure of the affected section at least to ensure staff safety.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps