Additional floor in Kuwait - Mahboula

Additional floor in Mahboula

Adding a floor to an existing house in Mahboula starts with a detailed assessment of the current foundations and columns. We evaluate the structure's load-bearing capacity, then execute necessary reinforcement and pour the new frame in harmony with the existing work.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most houses in Mahboula sit on standard residential plots of 500 to 750 square metres and typically carry three or four floors with adequate roof spans. When adding a new floor, the concrete foundations and underground piles must be inspected to confirm they were designed for extra load. Often the existing columns need reinforcement with added steel or resin injection before pouring the new frame, which requires soil studies and approval from the municipality's site engineer.

Mahboula lies in Ahmadi governorate, a residential area near Beach Road with level ground suited to foundational work.

We verify that existing foundations were designed for additional load before issuing a feasibility report for the addition.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Mahboula

Call now
How do we know if a house can carry an extra floor?

We conduct a full survey of the existing foundations and columns, take soil samples, calculate the added load, and issue a feasibility report. If reinforcement is needed, we execute it before pouring the new frame.

Can the new floor be poured separately from the old building?

No, it must be structurally connected to the existing building through shared columns and continuous reinforcement. This ensures unified performance under load and seismic stress.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works