Additional floor in Kuwait - Dhaher

Additional floor in Dhaher

Adding a floor in Dhaher's desert region requires precise assessment of foundations on sandy and gravelly soil. We inspect the existing frame, design the new floor accounting for severe climate and thermal expansion.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Dhaher houses are in a remote desert zone, most being one or two storeys on large plots with shallow to moderate foundations. The soil is sandy with variable gravel layers, so bearing capacity differs from plot to plot. Adding a floor requires new test excavation and foundation raising if needed. Dhaher's temperature extremes are severe, so we use salt and moisture resistant concrete with expanded joint gaps.

Dhaher is in Ahmadi governorate near the Saudi border with an extremely harsh desert climate.

Thermal expansion joints between columns and floors require wider spacing in extreme desert zones.

Back to Additional floor

What the work covers - Additional floor

What the work covers

Structural assessment through new-floor handover, handled as one coordinated job

  • Second-floor addition

    New floor built over an existing ground storey with full structural tie-in

  • Third-floor addition

    Extra storey above two existing floors after load-bearing verification

  • Ground-floor construction

    Full ground floor built as a planned base for future upper additions

  • Rooftop floor addition

    Floor added above the existing roof slab with load and waterproofing checks

  • Rebar tie-in to columns

    Drilled epoxy-anchored dowels into existing columns for the new frame

  • Insulation and finishing

    Roof thermal insulation, interior finishing and facade work for the new floor

How it works.

  1. First contact

    Call or WhatsApp us with the villa details and required floor count

  2. Site assessment

    Site visit to inspect the existing frame and assess column capacity

  3. Drawings and permit

    We prepare approved addition drawings and follow up the municipality permit

  4. Structural build

    Rebar tie-in, column and slab pours, block walls and roof insulation

  5. Handover

    Final inspection and handover with the required completion documents

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Additional floor in Dhaher

Call now
Can Dhaher's sandy soil safely support a third floor addition?

Yes, but requires test excavation to confirm bearing layer depth and soil capacity. If gravel strata are near and strong, addition is feasible with modified foundation design.

How do we protect the new structure from Dhaher's extreme heat?

We use salt and moisture treated concrete, wider thermal expansion joints between beams and columns, and ensure underfloor ventilation to reduce thermal stress on foundations.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works