
Bathroom finishing in Yarmouk
Bathroom finishing in Yarmouk requires careful moisture and leak management in both older and newer residential buildings. We cover flooring, walls and ceiling with waterproof membranes, then install tiles, fixtures and final fittings end-to-end.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Yarmouk is built around 4 to 6-storey residential apartment blocks, many dating back 20 years or more. Older bathrooms often leak behind tiles and walls, requiring full removal of previous layers down to concrete. We apply waterproof membrane across the entire floor and walls to at least 1.80 metres height, then install tiles, drainage and fixtures with sealed joints.
Yarmouk lies in Capital governorate, an older to middle-aged residential area of attached apartment blocks near Yarmouk Co-operative.
We apply waterproof membrane at least 0.8 mm thick across the entire bathroom floor and walls before any fixture installation.

What the service covers
Bathroom finishing handled as one package from membrane to final fittings

Waterproofing and prep
Waterproof membrane applied to floor and walls before any tiling

Tiling and stonework
Porcelain or marble set on suitable adhesive with moisture-resistant grout

Internal plumbing
Water supply, drain connections, and full sanitary ware installation

Ceilings and gypsum
Moisture-resistant gypsum board concealing ventilation and lighting runs

Aluminium and glass
Shower screens, aluminium frames, and mirrors sealed with correct silicone

Electrical and ventilation
Recessed lighting in the gypsum and ventilation fans suited to humid conditions
How it works.
Contact and site visit
Call or WhatsApp us to arrange a bathroom inspection visit
Assessment and quote
We assess the existing condition and provide a detailed quote covering materials and works
Material selection
You select tiles, sanitary ware, and fittings before work begins
Phased execution
Membrane, then tiling, plumbing, gypsum, and finally fittings in correct sequence
Inspection and handover
We test water and drain lines and check all surfaces before final handover
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Bathroom finishing
Other services in Yarmouk
Questions about Bathroom finishing in Yarmouk
Call nowDo you remove old tiles and damaged membrane before new finishing?
Yes, we strip all previous layers, cracked tiles and damaged membranes down to clean concrete. This ensures the new membrane bonds properly and prevents leaks later.
How high does the waterproof membrane go on bathroom walls?
We apply membrane on all walls from floor to ceiling in the shower corner, or to at least 1.80 metres if there is no shower, to cover the spray zone and high-moisture area.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps