Waterproof coating in Kuwait - Daiya

Waterproof coating in Daiya

Waterproof liquid coating on roofs in Daiya protects villas and residential buildings from water seepage and seasonal moisture. We perform thorough cleaning and crack repair before applying multiple protective layers.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya comprises residential villas and small apartment blocks with flat roofs, many of them older buildings built thirty or more years ago. Concrete of that age is prone to fine cracking and surface deterioration, requiring careful inspection for existing leaks before we start. The roof must be cleaned of sand, dirt and algae from seasonal moisture, then any cracks filled with flexible compound before the first liquid waterproof coat is applied.

Daiya sits in Capital governorate, a quiet residential district near Daiya Park and a British school.

Most villa roofs in Daiya are flat with slight pitch toward visible drain pipes at the outer edge.

Back to Waterproof coating

See also: Roof waterproofing in Daiya

What the work covers - Waterproof coating

What the work covers

Substrate cleaning, crack repair and multi-coat application of liquid waterproof coating.

  • Surface inspection

    Locating cracks, open pores and any spalling before work starts.

  • Cleaning and decontamination

    Removing dust, oils and old loose layers for proper coating adhesion.

  • Crack filling

    Sealing hairline and wider cracks with flexible repair mortar before coating.

  • Primer coat

    A penetrating primer that anchors the waterproof coating into the concrete substrate.

  • Waterproof coating coats

    Applying at least 2 cross-direction coats for uniform thickness and full coverage.

  • Corners and drain sealing

    Reinforcing vulnerable junctions at corners, drain collars and window sills.

How it works.

  1. Contact us

    Call or WhatsApp us and send photos of the affected surface.

  2. Site assessment

    We visit to measure the area and assess concrete and existing coating condition.

  3. Surface preparation

    Cleaning, crack repair and applying the bonding primer coat.

  4. Coating application

    Applying waterproof coating coats with reinforced corners and drain details.

  5. Handover check

    Checking coverage, coat thickness and full cure before handing over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Waterproof coating in Daiya

Call now
Do you treat existing leaks before applying liquid coating?

Yes. We inspect the interior and exterior of the roof to locate the leak source, fill cracks and gaps with flexible compound, then apply the liquid coating layers for complete sealing.

How do you clean an old roof with algae and dampness?

We use a mechanical brush and high-pressure water wash to remove algae and dirt, then allow the roof to dry completely before filling cracks and applying the waterproof coating.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works