Waterproof coating in Kuwait - Ardhiya Warehouses

Waterproof coating in Ardhiya Warehouses

Waterproof liquid coating in Ardhiya Warehouses protects the broad expanse of storage roof surfaces from water seepage. We assess the large flat roofs, clean them thoroughly, and apply multiple seal coats with precision.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ardhiya warehouse roofs are vast flat concrete expanse, each covering hundreds of square metres. Any crack or weak spot becomes a major problem when rains come, and seepage can damage stock quickly. The flat surface pools water in low spots, and the liquid coat must fill every gap and form an even water barrier across the entire roof. We start with thorough pressure and brush cleaning, seal all cracks and gaps, then apply three complete liquid coats.

Ardhiya Warehouses lies in Farwaniya governorate, an industrial storage complex with broad concrete roof spans.

Large roof areas must be divided into separate application zones to ensure even coating quality and uniform drying.

Back to Waterproof coating

See also: Roof waterproofing in Ardhiya Warehouses

What the work covers - Waterproof coating

What the work covers

Substrate cleaning, crack repair and multi-coat application of liquid waterproof coating.

  • Surface inspection

    Locating cracks, open pores and any spalling before work starts.

  • Cleaning and decontamination

    Removing dust, oils and old loose layers for proper coating adhesion.

  • Crack filling

    Sealing hairline and wider cracks with flexible repair mortar before coating.

  • Primer coat

    A penetrating primer that anchors the waterproof coating into the concrete substrate.

  • Waterproof coating coats

    Applying at least 2 cross-direction coats for uniform thickness and full coverage.

  • Corners and drain sealing

    Reinforcing vulnerable junctions at corners, drain collars and window sills.

How it works.

  1. Contact us

    Call or WhatsApp us and send photos of the affected surface.

  2. Site assessment

    We visit to measure the area and assess concrete and existing coating condition.

  3. Surface preparation

    Cleaning, crack repair and applying the bonding primer coat.

  4. Coating application

    Applying waterproof coating coats with reinforced corners and drain details.

  5. Handover check

    Checking coverage, coat thickness and full cure before handing over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Waterproof coating in Ardhiya Warehouses

Call now
How do you handle water pooling in low spots on the roof?

We first identify low spots and gaps where water pools. We fill these gaps with appropriate filler before the liquid coat to level the surface and prevent water from pooling after sealing.

What size cracks require repair before coating application?

Any cracks larger than 2 mm need repair. We use silicone filler or mortar to seal fine and medium cracks, because liquid coating alone cannot fill large cracks effectively.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works