Membrane roof waterproofing in Kuwait - Hateen

Membrane roof waterproofing in Hateen

Membrane roof waterproofing in Hateen protects villas and residential apartment blocks from seasonal water infiltration. We prepare the concrete substrate, lay the waterproofing roll with full overlap, and seal every weak point through to final handover.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen features residential villas and mid-rise apartment buildings with exposed concrete roofs, most built in recent decades. Roofs here face sharp seasonal rainfall and natural concrete cracking over time, requiring precise substrate preparation to remove salt and fine cracks before membrane laying. We inspect every expansion joint and wall-to-roof junction and seal them with extra membrane strips and specialized sealant.

Hateen sits in Hawalli governorate, a residential district of villas and apartment buildings near Hawalli centre.

We inspect every crack, expansion joint and junction before laying the membrane to prevent water seepage beneath the layer.

Back to Membrane roof waterproofing

See also: Roof waterproofing in Hateen

What the work covers - Membrane roof waterproofing

What the work covers

Substrate preparation, membrane laying and sealing every weak point through to handover.

  • Concrete preparation

    Clean the deck, remove loose old layers and fill cracks before bonding.

  • Primer coat

    Apply bituminous primer to ensure the membrane bonds firmly to the deck.

  • Torch application

    Heat-weld each membrane roll to the deck for a full continuous bond.

  • Parapet edge sealing

    Turn the membrane up parapet walls and seal edges with flexible flashing.

  • Drain collar detail

    Bond and seal the membrane around each drain collar to stop water ingress.

  • Post-installation check

    Inspect the full membrane, laps and details before the job is signed off.

How it works.

  1. First contact

    Call or WhatsApp us and describe the roof condition and leak symptoms.

  2. Roof survey

    We visit, inspect the deck, existing layers and all penetrations.

  3. Quotation

    We send a detailed quote covering membrane type, prep works and total cost.

  4. Installation

    Deck prep, primer, torch-welding rolls and sealing every edge and collar.

  5. Check and handover

    Full inspection of the completed membrane before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Membrane roof waterproofing in Hateen

Call now
How do you prepare an old concrete roof before laying the waterproofing membrane?

We scrape the surface to remove salt, dust and fine cracks, then fill any voids or pits with quick-setting cement mortar. The roof is then left clean and dry before the membrane is laid directly over it.

Do you seal the roof-to-wall junctions and openings?

Yes, every junction, expansion opening and pipe penetration is sealed with extra membrane strips and specialized sealant before the main layer is laid across the entire roof.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works