Wood parquet in Kuwait - Anjafa

Wood parquet in Anjafa

In Anjafa, wood parquet installation starts with selecting boards of consistent quality and preparing the substrate precisely for correct bonding. We oversee each step from fixing through to final cleaning and sealing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa apartment buildings range from three to five storeys with varying floor heights depending on construction and screeding. Before installation, we inspect floor levels, moisture, and hidden concrete defects. Adjacent units and horizontal pipes running beneath floors require careful load distribution when moving heavy materials and tools. We select adhesive that maintains bond even over larger floor areas.

Anjafa sits in Hawalli governorate, a district of multi-storey apartment buildings with varying interior floor heights.

We verify floor flatness to three millimetre tolerance over two metres before bonding begins.

Back to Wood parquet

See also: Parquet installation in Anjafa

What the service covers - Wood parquet

What the service covers

board selection and substrate work through to the final sealed and cleaned floor

  • Substrate levelling

    grinding and levelling the floor so every board bonds flat and even

  • Moisture barrier

    barrier coat between concrete and wood boards to block rising moisture

  • Board installation

    glue-down fixing with gap control and alignment checked every row

  • Cutting and details

    precise cuts around columns, door frames and thresholds with no visible gaps

  • Sanding and finishing

    full-floor sanding followed by multiple lacquer coats to seal the surface

  • Final inspection

    checking every board for bond, level and finish before handover

How it works.

  1. Call or whatsApp

    describe the space, wood preference and any existing floor condition

  2. Site visit

    we measure the area, check substrate level and identify any moisture risk

  3. Quotation

    a detailed quote covering boards, adhesive, levelling and finishing coats

  4. Installation

    substrate levelling, moisture barrier, glue-down boards and lacquer finish

  5. Inspection and handover

    full floor check, cleaning and site handover to the client

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wood parquet in Anjafa

Call now
Do we need additional levelling if the floor is uneven?

Yes, any unevenness exceeding three millimetres requires self-levelling compound before bonding. An uneven substrate causes adhesive failure and board cracking.

How long should we wait before walking on the parquet after installation?

Usually 24 hours for the adhesive to cure fully. We cover the floor and restrict all traffic until drying, cleaning and sealing are complete.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works