
Wall parquet in Firdous
Wall cladding in parquet in Firdous requires careful surface preparation of vertical faces to keep boards flat without cupping or gaps. We choose the adhesive and fastening method according to whether the wall is concrete or block work, and secure boards with mechanical anchors and architectural silicone only.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most residential buildings in Firdous have concrete or block walls whose surface is uneven after pouring or laying. Before fixing parquet boards to a vertical wall, we plane it lightly and clean it fully of dust and salt, because any gap under the board causes cupping when temperature and humidity change. We use two-part epoxy adhesive with steel fasteners at regular intervals, and leave a 2 mm expansion joint on each side from the wall.
Firdous is in Farwaniya governorate, where mid-rise residential buildings and regular plots dominate near the Sixth Ring Road.
We apply a vertical gap of 1 mm between each board to allow for timber expansion.

What wall parquet covers
Surface prep through final board fixing and sealing on every vertical face.

Wall preparation
Cleaning, levelling and firming the vertical surface before bonding.

Moisture barrier coat
A barrier coat protecting boards from AC condensation and wall dampness.

Board fixing
Bonding each board with heat-rated adhesive and even pressure.

Cutting and details
Accurate cuts around switches, frames and internal and external corners.

Borders and trims
Fitting trim profiles at top and bottom edges for a clean finish.

Final inspection
Checking flatness, bond strength and sealed joints along the full wall.
How it works.
First contact
Call or WhatsApp us to describe the walls and the finish you want.
Site visit
We visit to measure walls and assess the surface condition.
Quote and selection
A detailed quote is submitted with board samples for your choice.
Preparation and fixing
Wall prep, barrier coat then boards fixed in the correct sequence.
Handover and check
Flatness and joint check completed before final handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Wall parquet
Other services in Firdous
Questions about Wall parquet in Firdous
Call nowDo concrete walls in newer buildings need levelling before parquet cladding?
Yes, if the difference exceeds 3 mm over 2 metres. We use a levelling compound or self-levelling epoxy coating to fill gaps, then fix the boards over it.
What is the correct spacing between steel fasteners when fixing parquet to a wall?
We place steel fasteners every 30 cm horizontally and 40 cm vertically, ensuring each penetrates the concrete to a minimum depth of 25 mm for permanent stability.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps