Wall parquet in Kuwait - Firdous

Wall parquet in Firdous

Wall cladding in parquet in Firdous requires careful surface preparation of vertical faces to keep boards flat without cupping or gaps. We choose the adhesive and fastening method according to whether the wall is concrete or block work, and secure boards with mechanical anchors and architectural silicone only.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most residential buildings in Firdous have concrete or block walls whose surface is uneven after pouring or laying. Before fixing parquet boards to a vertical wall, we plane it lightly and clean it fully of dust and salt, because any gap under the board causes cupping when temperature and humidity change. We use two-part epoxy adhesive with steel fasteners at regular intervals, and leave a 2 mm expansion joint on each side from the wall.

Firdous is in Farwaniya governorate, where mid-rise residential buildings and regular plots dominate near the Sixth Ring Road.

We apply a vertical gap of 1 mm between each board to allow for timber expansion.

Back to Wall parquet

See also: Parquet installation in Firdous

What wall parquet covers - Wall parquet

What wall parquet covers

Surface prep through final board fixing and sealing on every vertical face.

  • Wall preparation

    Cleaning, levelling and firming the vertical surface before bonding.

  • Moisture barrier coat

    A barrier coat protecting boards from AC condensation and wall dampness.

  • Board fixing

    Bonding each board with heat-rated adhesive and even pressure.

  • Cutting and details

    Accurate cuts around switches, frames and internal and external corners.

  • Borders and trims

    Fitting trim profiles at top and bottom edges for a clean finish.

  • Final inspection

    Checking flatness, bond strength and sealed joints along the full wall.

How it works.

  1. First contact

    Call or WhatsApp us to describe the walls and the finish you want.

  2. Site visit

    We visit to measure walls and assess the surface condition.

  3. Quote and selection

    A detailed quote is submitted with board samples for your choice.

  4. Preparation and fixing

    Wall prep, barrier coat then boards fixed in the correct sequence.

  5. Handover and check

    Flatness and joint check completed before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wall parquet in Firdous

Call now
Do concrete walls in newer buildings need levelling before parquet cladding?

Yes, if the difference exceeds 3 mm over 2 metres. We use a levelling compound or self-levelling epoxy coating to fill gaps, then fix the boards over it.

What is the correct spacing between steel fasteners when fixing parquet to a wall?

We place steel fasteners every 30 cm horizontally and 40 cm vertically, ensuring each penetrates the concrete to a minimum depth of 25 mm for permanent stability.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works