Wall parquet in Kuwait - Fintas

Wall parquet in Fintas

Wall parquet installation in Fintas faces a coastal environment with high salinity and persistent humidity. We apply special treatments to protect walls and boards from salt and marine moisture exposure.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Fintas homes are close to the beach and nature reserves, exposing both exterior and interior walls to salt and high humidity. Parquet wall cladding in this climate requires salt testing and special cleaning, then application of a strong moisture and salt barrier. We also select salt-resistant adhesive and pre-treated boards suited to severe humidity swings throughout the year.

Fintas lies in Ahmadi governorate near the coast and marine reserves, where buildings are exposed to salinity and marine moisture.

Relative humidity in Fintas reaches 80 percent in summer months, requiring special wall treatment before installation.

Back to Wall parquet

See also: Parquet installation in Fintas

What wall parquet covers - Wall parquet

What wall parquet covers

Surface prep through final board fixing and sealing on every vertical face.

  • Wall preparation

    Cleaning, levelling and firming the vertical surface before bonding.

  • Moisture barrier coat

    A barrier coat protecting boards from AC condensation and wall dampness.

  • Board fixing

    Bonding each board with heat-rated adhesive and even pressure.

  • Cutting and details

    Accurate cuts around switches, frames and internal and external corners.

  • Borders and trims

    Fitting trim profiles at top and bottom edges for a clean finish.

  • Final inspection

    Checking flatness, bond strength and sealed joints along the full wall.

How it works.

  1. First contact

    Call or WhatsApp us to describe the walls and the finish you want.

  2. Site visit

    We visit to measure walls and assess the surface condition.

  3. Quote and selection

    A detailed quote is submitted with board samples for your choice.

  4. Preparation and fixing

    Wall prep, barrier coat then boards fixed in the correct sequence.

  5. Handover and check

    Flatness and joint check completed before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wall parquet in Fintas

Call now
How do you protect parquet from salt and marine moisture?

We apply a salt-resistant moisture barrier under the boards, use salt-resistant adhesive, and pre-treated boards designed for high humidity swings.

Do walls near the beach need special cleaning before installation?

Yes, we test for salt deposits chemically and remove them with special cleaning before any primer or adhesive application.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works