Stair parquet in Kuwait - Hassawi

Stair parquet in Hassawi

Stair parquet installation in Hassawi handles modern residential buildings with uniform reinforced concrete treads. Precision in surface levelling and moisture isolation ensure board stability over time.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hassawi is a relatively modern building area; most buildings are small and medium flats, 6 to 10 stories, with straight concrete stairs. Concrete in these newer buildings is typically level and controlled, but may retain moisture from pouring water or nearby drain seepage. We apply a moisture barrier of bitumen or resin before levelling to prevent moisture absorption that could cause board swelling later.

Hassawi is located in Farwaniya governorate, a residential district of recently built apartment blocks.

Modern Hassawi buildings require a moisture barrier layer of 0.5 to 1 mm thickness before levelling compound is applied to the stair.

Back to Stair parquet

See also: Parquet installation in Hassawi

What the work covers - Stair parquet

What the work covers

From levelling each tread and riser through to fitting nosings and sanding the finished surface

  • Tread preparation

    Grinding and levelling each concrete tread before any board is laid

  • Accurate cutting

    Cutting each board to the exact tread and riser dimension with correct angle

  • Adhesive bonding

    Full-contact glue-down fixing rated for constant foot traffic on stairs

  • Stair nosings

    Fitting front nosing profiles that protect the board edge and reduce slip risk

  • Riser boards

    Covering the vertical riser face with a matching board for a clean unified look

  • Sanding and finish

    Hand sanding followed by coating or waxing suited to the chosen wood species

How it works.

  1. Call or whatsApp

    Tell us the stair count and type to set a site visit time

  2. Site measure

    We measure each tread, check the concrete and record the stair pitch

  3. Material selection

    You choose the wood species, nosing colour and surface finish type

  4. Prep and install

    We level each tread then fix boards, nosings and risers in sequence

  5. Finish and handover

    Hand sanding and final coat, then we check every step before handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Stair parquet in Hassawi

Call now
Why use a moisture barrier on a new concrete stair?

New concrete still dries internally for years. Moisture can rise by capillary action and be absorbed by parquet boards, causing swelling and warping. The barrier stops this absorption.

How many days should we wait for the barrier to dry before parquet installation?

It depends on the barrier type and ambient humidity. Typically 48 hours for liquid bitumen and 72 hours for resin under normal conditions.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works