Herringbone parquet in Kuwait - Hateen

Herringbone parquet in Hateen

Herringbone parquet installation in Hateen requires precise centre-line calculation and opposing cuts on villa and apartment floors. We start by levelling the floor and adjusting concrete levels, then lay the strips at opposing angles and bond them with adhesive and nails.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hateen villas and apartment buildings have basic concrete floors and surfaces that often need levelling before bonding. Herringbone parquet requires cutting each strip at a 45-degree angle and arranging them in an alternating pattern, which means using a precision saw and continuous measurement to ensure pattern uniformity. A flat surface and correct centre lines are essential to avoid gaps and misalignment, and we clean the floor of dust and moisture before starting.

Hateen sits in Hawalli governorate as a mixed residential district of villas and apartment buildings near Hateen Main Road.

We check the floor slope before installation; permitted slope does not exceed 3 millimetres per square metre.

Back to Herringbone parquet

See also: Parquet installation in Hateen

What the installation covers - Herringbone parquet

What the installation covers

From floor levelling and centre-line layout through bonding, trimming and final cleaning

  • Substrate levelling

    Detecting and filling low spots before any board is placed

  • Centre-line layout

    Marking axis lines so the pattern stays symmetrical across the room

  • 45-degree angle cutting

    Cutting each piece accurately to produce a clean herringbone chevron

  • Adhesive bonding

    Spreading adhesive fully under each piece and pressing it flush

  • Border and edge cuts

    Precise trimming at walls and thresholds to close the pattern neatly

  • Sanding and finishing

    Light sanding and a protective coat on solid boards after bonding

How it works.

  1. Call or whatsApp

    Tell us the area and your preferred wood type

  2. Site inspection

    We measure and check the substrate level and moisture condition

  3. Quotation

    A detailed quote covering materials, labour and any levelling needed

  4. Installation

    Levelling, centre-line layout, then precise bonding and cutting throughout

  5. Inspection and handover

    Every board is checked and any hollow spots are pressed before handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Herringbone parquet in Hateen

Call now
How long does floor levelling take before herringbone parquet laying?

It depends on the concrete condition; if the floor is relatively even we begin cutting and bonding directly. If there are significant deviations we use self-levelling screed.

Does herringbone parquet need moisture barrier under the surface?

Yes, we lay a moisture barrier on the concrete before bonding to prevent wood swelling and later cracks. This is essential in villas and apartments.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works