Mechanical marble fixing in Kuwait - Funaitees

Mechanical marble fixing in Funaitees

Heavy marble with metal brackets in Funaitees serves closely packed residential and commercial buildings with varied slab sizes. We precisely drill bracket positions, set them in concrete, then hang the marble on a secure anchoring system that prevents any slip.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Funaitees is densely developed with multi-storey residential buildings and ground-floor commercial units on relatively narrow, closely abutting plots. Exterior and partition walls sometimes carry heavy marble slabs from ground level up several floors, and anchoring them with brackets requires load distribution across multiple evenly spaced drill points. Joints between slabs must maintain sound insulation and protect against water ingress, especially on exterior walls exposed to moisture and salt-laden winds.

Funaitees sits in Mubarak Al-Kabeer governorate, a densely built residential and commercial district with closely packed buildings.

Exterior marble slabs are anchored with metal brackets spaced at intervals not exceeding 50 centimetres to carry loads and wind pressure.

Back to Mechanical marble fixing

See also: Marble & granite in Funaitees

What the work covers - Mechanical marble fixing

What the work covers

Anchor layout through drilling, bracket fitting, slab hanging, jointing and final seal.

  • Site survey

    Measure surfaces, assess substrate strength and mark anchor positions.

  • Substrate preparation

    Clean and level the wall so anchor loads distribute evenly.

  • Drilling and anchor fitting

    Drill anchor holes in stone and fix stainless steel brackets to structure.

  • Slab hanging

    Hang each marble slab on brackets, level and align every panel.

  • Expansion joints

    Insert flexible joint filler between slabs to absorb Kuwait's thermal movement.

  • Sealing and handover

    Seal all joints, clean stone faces and inspect every panel before handover.

How it works.

  1. Call or whatsApp

    Describe the surface, height and send photos if available.

  2. Site visit

    We measure, assess substrate strength and specify the anchor system.

  3. Stone and anchor selection

    We advise on stone grade and anchor type suited to the location.

  4. Fixing and installation

    Drill anchors, hang slabs, level panels and seal all joints.

  5. Check and handover

    Inspect every panel and joint condition before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Mechanical marble fixing in Funaitees

Call now
How do you maintain sound and moisture insulation in marble joints on exterior walls?

We fill joints with flexible, water-resistant sealant, then apply an exterior protective layer that provides thermal and sound insulation and prevents water ingress.

Can you anchor heavy marble slabs on old walls in existing buildings?

Yes, but we must first test the concrete strength with specialized equipment to ensure it can carry the load, and may need to add surface treatment or local reinforcement.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works