Marble wall cladding in Kuwait - Salhiya

Marble wall cladding in Salhiya

Marble wall cladding in Salhiya requires precise concrete surface preparation and firm fixing with flexible adhesive. We select slab thickness and joint patterns based on wall height and moisture exposure, and seal all gaps to ensure long-term durability.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Commercial and hotel buildings in Salhiya feature broad internal walls and shop fronts that need marble of high specification. The concrete surfaces in these buildings are often cast with limited precision, requiring thorough grinding and levelling before fixing. The higher relative humidity in the commercial zone also demands moisture-resistant adhesive and high-grade silicone for joints. We apply a chemical protection layer to the finished surface to prevent seepage and salt staining.

Salhiya lies in Capital governorate, a commercial and hotel district with residential buildings above.

We fix marble slabs 20 to 30 mm thick on internal walls with vertical and horizontal joints 3 to 5 mm wide.

Back to Marble wall cladding

See also: Marble & granite in Salhiya

What the service covers - Marble wall cladding

What the service covers

Wall preparation through slab fixing, joint sealing and stone impregnation to final handover.

  • Wall preparation

    Surface cleaned, voids and cracks repaired before any slab is fixed.

  • Layout design

    Setting-out axes and start points to keep panels plumb and aligned.

  • Cutting and shaping

    Water-cooled diamond blade cutting and profiling around openings and corners.

  • Flexible-mortar fixing

    Marble-grade flexible adhesive mortar applied full-coverage to every slab.

  • Jointing and silicone

    Movement joints filled with flexible silicone at all corners and junctions.

  • Impregnation and handover

    Penetrating impregnator seals stone pores before final inspection and handover.

How it works.

  1. Call or whatsApp

    Contact us and describe the wall area and finish you have in mind.

  2. Site survey

    We measure walls, check the substrate and note any moisture or surface faults.

  3. Quotation

    A detailed quote covering stone, fixing, and removal of existing finish if needed.

  4. Preparation and fixing

    Substrate prepared, slabs fixed, joints grouted and silicone applied at all edges.

  5. Sealing and handover

    Impregnator applied after full cure, final inspection done and area handed over clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Marble wall cladding in Salhiya

Call now
How do you prepare uneven concrete walls before marble installation?

We use a power grinder to remove bumps and debris, then level the surface with concrete repair mortar. After that, we wash the surface with water and let it dry before applying adhesive.

What type of silicone do you use for marble joints in damp areas?

We use high-grade neutral-cure silicone to avoid chemical reaction with the marble. We clean joints after 48 hours to remove excess before final treatment.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works