Marble basins in Kuwait - Daiya

Marble basins in Daiya

Marble basin installation in Daiya requires precise measurement of bowl dimensions and secure bedding on bathroom and kitchen pedestals. The area features modern residential buildings with moderate-sized units where marble must be fitted without any water leakage.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya's apartment blocks are relatively modern, mostly mid-rise residential buildings with individual units, separate water meters, and standard bathrooms. Marble basins are bedded on a level metal or concrete base and need precise measurement of bowl height and distance between the water supply and tap position. Good joint sealing is essential because moisture can affect surrounding tiles and finishes in these enclosed units.

Daiya sits in the Capital governorate, a modern residential district near the British School of Kuwait and Daiya Park.

Most marble basins in Daiya are installed at 75 to 85 cm height depending on the support pedestal base.

Back to Marble basins

See also: Marble & granite in Daiya

What the installation covers - Marble basins

What the installation covers

Basin support measurement through stone cutting, fixing, tap-hole profiling and sealed handover.

  • Support measuring

    Precise measurement of the cabinet or pedestal before any cutting.

  • Slab cutting and shaping

    Wet diamond-blade cutting and front edge profiling to the required shape.

  • Basin and tap holes

    Circular core drilling to prevent cracking around basin or tap openings.

  • Mortar bed fixing

    Full mortar coverage under the slab with no voids under basin weight.

  • Silicone edge sealing

    Anti-mould silicone seals every joint between stone, basin and wall.

  • Sealing and final check

    Stain impregnator applied and level and joint tightness verified before handover.

How it works.

  1. Call or whatsApp

    Call or WhatsApp us and share a photo of the existing basin or cabinet.

  2. Site measure and check

    Site visit to measure the support, check the wall condition and drain position.

  3. Stone selection

    We present suitable stone samples and you choose the type and edge profile.

  4. Cutting and fixing

    Slab cut, basin and tap holes core-drilled, then full mortar bed fixing.

  5. Seal and handover

    Stain impregnator applied, anti-mould silicone sealed at joints and basin handed over ready for use.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Marble basins in Daiya

Call now
Do you cut the tap hole in marble before or after installation?

We cut the tap hole before bedding based on precise site measurement. This ensures hole accuracy and reduces the risk of marble cracking.

What material do you use to seal marble basin joints?

We use flexible, sanitary silicone with anti-mould and anti-bacterial properties. The material tolerates minor building movement and prevents complete water infiltration.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works