Gypsum board in Kuwait - Nuqra

Gypsum board in Nuqra

Gypsum board ceilings and walls in Nuqra for high-density residential buildings to tight, efficient finishing standards. We install boards on parallel metal tracks and coordinate smoothly with painting works.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Nuqra residential buildings are densely built on limited plots with uniform ceilings and standard floor heights, allowing fast gypsum board installation using standardised metal tracks. Residential units are similar in design, so we replicate the same installation and joint pattern across each floor. The quick building handover requires us to complete all joints and base coats before units transfer to residents.

Nuqra sits in Hawalli governorate near Salmiya and is characterised by medium-rise residential apartment buildings.

We install metal tracks at a fixed 600mm spacing to ensure adequate board support and suspended ceiling capacity.

Back to Gypsum board

Gypsum board services - Gypsum board

Gypsum board services

Full gypsum board works covering ceilings, walls, partitions, decor and specialist wet-area board

  • Gypsum ceilings

    Flat or multi-level ceilings housing lighting and AC ducts

  • Walls and partitions

    Lightweight partitions and wall linings to divide spaces quickly

  • Gypsum decor and design

    Cove recesses, cornices and decorative detail work fitted accurately

  • Moisture-resistant board

    Green moisture-resistant board suited to bathrooms and kitchens

  • Gypsum TV wall

    Custom gypsum TV-wall units with concealed cable runs behind

  • Gypsum-board room

    Full-room gypsum lining from ceiling down to all four walls

How it works.

  1. Contact us

    Call or WhatsApp us to describe the space and requirement

  2. Site measure

    We visit, measure all surfaces and identify services routing

  3. Quotation

    A detailed quote covering materials, areas and method is provided

  4. Installation

    Frame, board, tape, joint and sand to a flat finish

  5. Inspection and handover

    Level, joints and service hatches checked before handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Gypsum board in Nuqra

Call now
How long does gypsum board installation take in a multi-storey building?

It depends on the number of floors and units, but in identical buildings we can complete board installation and basic joint finishing in one to two weeks per floor with an organised crew.

Do you coordinate with painting and other finishing trades?

Yes, we hand over ceilings and walls taped, filled and sanded ready for paint, and confirm a handover schedule with the painters to avoid delays.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works