Gypsum ceilings in Kuwait - Daiya

Gypsum ceilings in Daiya

Installing tight gypsum ceilings in Daiya covers mechanical and electrical services, delivering a flat paint-ready surface. We work on residential villas and small apartment buildings with precise levelling and tight suspension grids.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Daiya has relatively new residential villas and mid-rise apartment buildings with modern designs. These buildings typically have separate central air systems for each unit and carefully planned electrical distribution. Ceiling heights allow moderate drops, usually no more than 12 centimetres. We anchor grids to concrete columns and beams, ensuring pipe and cable routes do not conflict during installation.

Daiya is in Kuwait governorate near the British School and Daiya Park.

We measure available height in each room and set the suspension level to ensure all ductwork and electrical runs are concealed.

Back to Gypsum ceilings

See also: Gypsum board in Daiya

What the installation covers - Gypsum ceilings

What the installation covers

Level setting and grid suspension through to a paint-ready ceiling surface.

  • Level survey and layout

    Ceiling drop level set around AC diffuser and light positions.

  • Suspended metal grid

    Galvanised tracks and studs hung from concrete slab with threaded rods.

  • Services routing

    AC ducts and electrical conduits coordinated before boards are fixed.

  • Board fixing and cutting

    Boards cut precisely for light boxes and diffuser openings with no gaps.

  • Taping and jointing

    Fibre tape and multi-coat jointing compound feathered to a flat surface.

  • Paint-ready finish

    Sanding, cleaning and final inspection before handover for painting.

How it works.

  1. First contact

    Call or WhatsApp us to describe the space and book a site visit.

  2. Site survey

    We visit to measure the ceiling and map existing AC and electrical runs.

  3. Quotation

    A detailed quote covering materials, labour and work sequence.

  4. Installation and jointing

    Grid hung, services routed, boards fixed, joints taped and sanded flat.

  5. Inspection and handover

    Level, joints and cut-outs checked, then handed over paint-ready.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Gypsum ceilings in Daiya

Call now
Does gypsum ceiling installation affect ventilation openings and natural light?

No, we keep existing ventilation and window openings unchanged and plan the ceiling level to avoid blocking airflow or light. We coordinate with architectural drawings before setting the final drop height.

How many times do you check the level during gypsum installation?

We check the level initially to set anchor points, again after the grid is hung, and once more before panels go up to ensure a completely flat surface. Any deviation over 2 millimetres is corrected immediately.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works