Gypsum ceilings in Kuwait - Anjafa

Gypsum ceilings in Anjafa

Gypsum ceiling installation in Anjafa conceals ducts and runs beneath a flat, paint-ready surface. We set the suspension grid level and true before fixing the boards, then finish all joints for a seamless result.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Anjafa has mid-range to older villas with ceilings 3 to 3.5 metres high, and owners often request gypsum board ceilings to hide aged ducts and cabling. A suspended ceiling lets us conceal all electrical, drainage and cooling runs in the gap between the original and new ceiling, which requires careful height calculation to avoid crushing wires and pipes. We use calibrated metal grid and sturdy steel hangers to keep the ceiling stable under the weight of boards and compound.

Anjafa lies in Hawalli governorate, a neighbourhood of medium-age residential villas where concealing and updating utility runs is a recurring need.

Original ceiling heights in most Anjafa villas range from 3 to 3.5 metres, allowing safe clearance for runs beneath the suspended ceiling.

Back to Gypsum ceilings

See also: Gypsum board in Anjafa

What the installation covers - Gypsum ceilings

What the installation covers

Level setting and grid suspension through to a paint-ready ceiling surface.

  • Level survey and layout

    Ceiling drop level set around AC diffuser and light positions.

  • Suspended metal grid

    Galvanised tracks and studs hung from concrete slab with threaded rods.

  • Services routing

    AC ducts and electrical conduits coordinated before boards are fixed.

  • Board fixing and cutting

    Boards cut precisely for light boxes and diffuser openings with no gaps.

  • Taping and jointing

    Fibre tape and multi-coat jointing compound feathered to a flat surface.

  • Paint-ready finish

    Sanding, cleaning and final inspection before handover for painting.

How it works.

  1. First contact

    Call or WhatsApp us to describe the space and book a site visit.

  2. Site survey

    We visit to measure the ceiling and map existing AC and electrical runs.

  3. Quotation

    A detailed quote covering materials, labour and work sequence.

  4. Installation and jointing

    Grid hung, services routed, boards fixed, joints taped and sanded flat.

  5. Inspection and handover

    Level, joints and cut-outs checked, then handed over paint-ready.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Gypsum ceilings in Anjafa

Call now
How do we conceal old pipes and cables with a gypsum ceiling?

We hang a calibrated metal grid with steel suspenders from the original ceiling, then fix gypsum boards to it. Pipes and cables remain in the space above, safe and out of sight.

What is the minimum gap needed between the original and new ceiling?

It depends on the size of pipes and cables to be hidden. We typically allow at least 15 to 20 centimetres, and coordinate with the electrician and plumber to confirm the routes beforehand.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works