Gypsum-board room in Kuwait - Fintas

Gypsum-board room in Fintas

Fully enclosed gypsum-board rooms in Fintas enable quick subdivision of coastal villas and apartments near the sea. The carefully galvanised steel frame withstands high humidity and marine salinity, and screw-fixed boards are ready for paint.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Fintas is a coastal residential area with villas and apartments close to the beach and the co-operative, and most buildings face high humidity and salt spray from the sea. Constant moisture demands corrosion-resistant metal with very high efficiency and advanced external moisture protection. Most villas and apartments have strong concrete foundations, but external walls need extra protection from salinity and wind-driven moisture.

Fintas sits in Ahmadi governorate, a coastal residential area near Fintas Co-op and the beach.

Steel frames in Fintas must be galvanised with extra thickness to withstand a salty, humid climate year-round.

Back to Gypsum-board room

See also: Gypsum board in Fintas

What the build covers - Gypsum-board room

What the build covers

Galvanised steel frame, screw-fixed boards, embedded services and a surface ready for paint.

  • Steel-stud frame

    Galvanised runners and studs sized to the room height and layout.

  • Electrical and AC routing

    Conduits and cables run through the frame before boards are fixed.

  • Board fixing

    Boards screw-fixed to all walls and ceiling with correct perimeter gaps.

  • Door frame and openings

    Door opening cut and framed with reinforced steel to carry the door frame.

  • Taping and jointing

    Fibre tape and multiple compound coats on every joint for a flat surface.

  • Paint-ready surface

    Light sanding and a final check before handover for painting.

How it works.

  1. Contact and site visit

    Call or WhatsApp us to arrange a site visit at your convenience.

  2. Measurement and layout

    We measure the space and mark service routes and the door position.

  3. Frame installation

    Galvanised runners and studs fixed to floor, slab and adjacent walls.

  4. Services and boarding

    Conduits and cables routed inside the frame before boards are screw-fixed.

  5. Finishing and handover

    Joints taped, surface levelled and room inspected before final handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Gypsum-board room in Fintas

Call now
Can gypsum-board walls tolerate high coastal humidity?

Yes, provided we use high-grade galvanised steel framing and advanced moisture barriers on both outer and inner faces. We also recommend regular ventilation within the room.

Does marine salinity affect the screws fixing the boards?

Screws must have high corrosion resistance to withstand the salty climate. We use stainless-steel screws or those with additional protective coatings.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works