
Gypsum-board room in Fintas
Fully enclosed gypsum-board rooms in Fintas enable quick subdivision of coastal villas and apartments near the sea. The carefully galvanised steel frame withstands high humidity and marine salinity, and screw-fixed boards are ready for paint.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Fintas is a coastal residential area with villas and apartments close to the beach and the co-operative, and most buildings face high humidity and salt spray from the sea. Constant moisture demands corrosion-resistant metal with very high efficiency and advanced external moisture protection. Most villas and apartments have strong concrete foundations, but external walls need extra protection from salinity and wind-driven moisture.
Fintas sits in Ahmadi governorate, a coastal residential area near Fintas Co-op and the beach.
Steel frames in Fintas must be galvanised with extra thickness to withstand a salty, humid climate year-round.

What the build covers
Galvanised steel frame, screw-fixed boards, embedded services and a surface ready for paint.

Steel-stud frame
Galvanised runners and studs sized to the room height and layout.

Electrical and AC routing
Conduits and cables run through the frame before boards are fixed.

Board fixing
Boards screw-fixed to all walls and ceiling with correct perimeter gaps.

Door frame and openings
Door opening cut and framed with reinforced steel to carry the door frame.

Taping and jointing
Fibre tape and multiple compound coats on every joint for a flat surface.

Paint-ready surface
Light sanding and a final check before handover for painting.
How it works.
Contact and site visit
Call or WhatsApp us to arrange a site visit at your convenience.
Measurement and layout
We measure the space and mark service routes and the door position.
Frame installation
Galvanised runners and studs fixed to floor, slab and adjacent walls.
Services and boarding
Conduits and cables routed inside the frame before boards are screw-fixed.
Finishing and handover
Joints taped, surface levelled and room inspected before final handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Gypsum-board room
Other services in Fintas
Questions about Gypsum-board room in Fintas
Call nowCan gypsum-board walls tolerate high coastal humidity?
Yes, provided we use high-grade galvanised steel framing and advanced moisture barriers on both outer and inner faces. We also recommend regular ventilation within the room.
Does marine salinity affect the screws fixing the boards?
Screws must have high corrosion resistance to withstand the salty climate. We use stainless-steel screws or those with additional protective coatings.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps