
Gypsum-board room in Farwaniya
Gypsum-board rooms in Farwaniya convert open apartment spaces into enclosed, functional units ready for occupancy. We install the galvanised steel frame and screw-fix boards, integrate all electrical and plumbing services safely and with easy maintenance access.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Farwaniya features newer multi-storey residential buildings with standard-sized apartments and ceilings around 3 metres high. Gypsum-board requests here are mostly to partition a bedroom or living room from open space, often requiring sound and thermal separation due to high population density and adjoining flats. Pre-existing services in walls and ceilings need careful rerouting to avoid crossing or clashing with existing wiring and pipes.
Farwaniya sits in Farwaniya governorate, a dense residential district near Farwaniya Hospital and the Third Ring Road.
Ceiling height in Farwaniya flats is around 3 metres, allowing standard steel frame installation and 12.5 mm gypsum-board thickness.

What the build covers
Galvanised steel frame, screw-fixed boards, embedded services and a surface ready for paint.

Steel-stud frame
Galvanised runners and studs sized to the room height and layout.

Electrical and AC routing
Conduits and cables run through the frame before boards are fixed.

Board fixing
Boards screw-fixed to all walls and ceiling with correct perimeter gaps.

Door frame and openings
Door opening cut and framed with reinforced steel to carry the door frame.

Taping and jointing
Fibre tape and multiple compound coats on every joint for a flat surface.

Paint-ready surface
Light sanding and a final check before handover for painting.
How it works.
Contact and site visit
Call or WhatsApp us to arrange a site visit at your convenience.
Measurement and layout
We measure the space and mark service routes and the door position.
Frame installation
Galvanised runners and studs fixed to floor, slab and adjacent walls.
Services and boarding
Conduits and cables routed inside the frame before boards are screw-fixed.
Finishing and handover
Joints taped, surface levelled and room inspected before final handover.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Gypsum-board room
Other services in Farwaniya
Questions about Gypsum-board room in Farwaniya
Call nowCan you add sound insulation to the new gypsum-board wall?
Yes, we fill the cavity between the steel frame with sound-absorbing material before fixing the boards, which reduces noise transmission between units.
What if electrical wiring already runs in the path of the new wall?
We survey the path beforehand with a detector, then reroute the wires to a safe path outside the new frame or space them safely from water pipes per code.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps