Wall breaking in Kuwait - Mubarak Al-Abdullah

Wall breaking in Mubarak Al-Abdullah

Targeted wall breaking in Mubarak Al-Abdullah demands precision because most residential villas sit on closely spaced concrete frames. We begin with a full survey of each wall to map rebar and pipe runs before any impact work.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Mubarak Al-Abdullah villas are built on 500 to 800 square-metre plots, and internal walls are either cast concrete partitions or brick walls stuck to a concrete column on each side. When breaking a wall between two rooms or a room and a corridor, the side concrete column must stay intact, because any damage to it affects the entire floor's stability. We use controlled hand-held breakers, never heavy breakers.

Mubarak Al-Abdullah sits in Hawalli governorate, a district of relatively older residential villas on regular plots.

Most villa internal walls are reinforced at a lower grade than main columns and need radar survey or manual probing before breaking.

Back to Wall breaking

See also: Demolition & removal in Mubarak Al-Abdullah

What the work covers - Wall breaking

What the work covers

Breaking internal walls from initial survey through to a clean, squared opening ready for finishing

  • Full partition removal

    Full block partition taken down keeping columns and slab intact

  • Partial wall opening

    Door or window opening cut into an existing wall with straight edges

  • Hidden services survey

    Locating electrical and plumbing lines before breaking starts

  • Dust and area containment

    Sheeting off adjacent rooms to stop breaking dust spreading

  • Block breaking method

    Hammer drill or disc cutter selected to suit wall thickness and block type

  • Opening edge finishing

    Edges chased and levelled ready for lintel or plaster finish

How it works.

  1. First contact

    Call or WhatsApp us and describe the wall to be broken

  2. Site survey

    We visit, check wall type, hidden services and surrounding conditions

  3. Prep and containment

    Adjacent openings sealed and floors protected before any breaking starts

  4. Breaking and clearing

    Wall broken with the correct tool and rubble collected immediately

  5. Final handover

    Edges dressed, site cleaned, and opening handed over ready for finishing

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Wall breaking in Mubarak Al-Abdullah

Call now
Can we break a wall between two rooms in a villa and keep the column intact?

Yes, that is standard work in Mubarak Al-Abdullah. We locate the column precisely beforehand and break the wall around it with a safety margin, leaving the column standing to support the floor.

How do you avoid damaging pipes and wires hidden in the walls?

We scan the wall with a metal detector and moisture meter before breaking, map the pipe and wire routes and mark them clearly, then break carefully around those runs to avoid cutting them.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works