
Tile removal in Sabah Al-Nasser
Tile removal in Sabah Al-Nasser covers multiple residential units within a large housing cooperative. We strip tiles precisely from each apartment while strictly managing debris and dust in shared spaces and corridors.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Sabah Al-Nasser is a large housing cooperative holding hundreds of apartments and villas in multi-storey buildings on regular plots. Most structures were built in the 1990s and early 2000s, with original tiles set in thick layers of grey cement mortar. Stripping at this residential density requires tight planning: we schedule work in short shifts, cover corridors with protective boards, and use filtered dust-extraction equipment to prevent spread between adjacent units. Each apartment is treated separately with full door and window sealing.
Sabah Al-Nasser lies in Farwaniya governorate near Sixth Ring Road.
We follow the housing cooperative management's work schedule to ensure shared services and lifts remain uninterrupted.

What tile removal covers
Controlled breaking and full debris clearance from floor to wall base, leaving a clean substrate.

Broken tile lifting
Removing cracked or raised tiles without damaging adjacent walls or surfaces.

Adhesive bed removal
Scraping off old adhesive beds to leave a flat, bondable concrete surface.

Wall tile removal
Stripping wall ceramic and porcelain while preserving the plaster or block face.

Substrate inspection
Checking the slab or plaster after removal for cracks, hollows or moisture.

Debris clearance
Collecting and removing all broken tile debris from site on a daily basis.

Ready-base handover
Handing over a clean, level surface ready for the new tiling team to proceed.
How it works.
Call or whatsApp
Describe the area, tile type and reason for removal to arrange a site visit.
Site assessment
We measure the area and check tile layers and substrate condition on site.
Quotation
A clear quote covering removal and full debris clearance is provided.
Removal works
Tiles are broken, adhesive scraped off, and debris removed without damaging the base.
Substrate handover
The clean, inspected surface is handed over ready for new tile installation.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Tile removal
Other services in Sabah Al-Nasser
Questions about Tile removal in Sabah Al-Nasser
Call nowHow do you move debris from an apartment in a multi-storey building?
We use sealed plastic bins transported via lifts or stairs carefully. Each bin is covered with damp cloth to prevent dust from spreading through corridors and stairwells before removal from the building.
Can you strip tiles in multiple apartments on the same day?
Yes, but with time gaps between adjacent apartments. We start one floor, finish it with complete cleaning, then move to another floor to minimise noise and dust for remaining residents.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps