
Tile-over-tile installation in Salhiya
Installing new tiles over old in Salhiya offers an alternative to demolishing existing floor and wall surfaces. We assess the current tile bed and adhesion, prepare the surface, then fix new tiles with even spacing and a level finish.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Salhiya contains shops, clinics and offices in multi-storey and older buildings. Floors in these units often carry thick old ceramic or stone tiles, and retiling over the existing saves time and reduces dust and debris in an active commercial zone. Before installation we test the old tile adhesion to the concrete using simple methods, and if we find large voids or lost bond we remove those sections and reinforce the base before new installation.
Salhiya sits in the Capital governorate, an older commercial district near Sheraton Hotel and the central shopping complex.
New tiles fixed over old require high-strength adhesive to bridge small voids beneath the surface.

What the job covers
Assessing the existing tile bed, preparing the surface, and fixing new tiles solid and flat.

Existing tile check
Tap-testing the old tiles to locate hollow or loose areas before starting.

Surface preparation
Degreasing and abrading the glazed surface so adhesive bonds reliably.

High-bond adhesive
Applying a flexible adhesive rated for bonding over an existing ceramic layer.

Levelling and alignment
Using tile levelling clips to keep the new surface flat across the field.

Expansion joints
Leaving perimeter gaps and sealing them with flexible filler suited to Kuwait's heat.

Grouting and clean-up
Grouting joints with a humidity-suited type and cleaning the surface before handover.
How it works.
First contact
Call or WhatsApp us with the area description and location.
Site inspection
We visit to measure, tap-test tiles, and assess existing layer condition.
Quotation and approval
We submit a detailed quote covering materials, labour, and any removal zones.
Preparation and fixing
Surface abraded, adhesive applied, tiles fixed with levelling clips and expansion joints.
Grouting and handover
Joints grouted, surface cleaned, and area handed over after adhesive cure period.
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Tile-over-tile installation
Other services in Salhiya
Questions about Tile-over-tile installation in Salhiya
Call nowCan new ceramic be installed over thick old tiles without removing them?
Yes, if the old tiles are firmly bonded to the base. We test adhesion first, remove any loose sections, then prepare the surface and fix new tiles with strong adhesive.
Does installing ceramic over existing tile affect room height or door clearance?
Yes, the new surface will be higher by the added thickness, usually 8 to 12 mm. We check doors and thresholds and ensure adequate clearance before installation.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps