Outdoor tiling in Kuwait - Sharq

Outdoor tiling in Sharq

Outdoor tiling in Sharq must withstand intense heat and salt spray near the sea. We apply salt-resistant adhesives and grout, and lay multi-layer waterproofing beneath the tiles to ensure the surface lasts.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Sharq projects are tall residential towers on compact plots with limited outdoor areas, balconies and a main entrance facing the sea directly. Outdoor tiles there are exposed to sea spray and high heat year-round, so porcelain with high density and very low water absorption is essential. The levelling base needs fine gravel and salt-treated concrete before laying waterproofing in at least two coats, then fixing tiles with epoxy adhesive and epoxy grout.

Sharq is in Kuwait's Capital governorate, a district of tall residential towers near Kuwait Towers and the waterfront.

Outdoor tiles in Sharq must meet a water absorption rate of 0.5 per cent or less before installation.

Back to Outdoor tiling

See also: Ceramic & porcelain tiling in Sharq

What the work covers - Outdoor tiling

What the work covers

Base levelling and waterproofing through tile fixing, jointing and clean handover.

  • Base preparation

    Level and repair the substrate before any adhesive is applied.

  • Sub-tile waterproofing

    Membrane layer applied before tiling to protect the base.

  • Tile fixing

    Flexible heat-rated adhesive with full back coverage on each tile.

  • Expansion joints

    Flexible sealant joints placed to absorb thermal movement across the field.

  • Cutting and edge trim

    Precise cuts around drains and corners with finished aluminium trim.

  • Clean-up and handover

    Full debris removal and tap-test of every tile before handover.

How it works.

  1. Call or whatsApp

    Describe the area and location to arrange a site visit.

  2. Site inspection

    Measure the area, check substrate condition and drain fall.

  3. Quotation

    A detailed quote covering materials, fixing and waterproofing is submitted.

  4. Execution

    Base prep, waterproofing, fixing, jointing and trim done in sequence.

  5. Inspection and handover

    Every tile is tapped and joints and falls are checked before handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Outdoor tiling in Sharq

Call now
How do you protect the tiles from sea spray and salt?

We choose high-density porcelain with low water absorption, and use epoxy-based adhesive and grout that resist salt. We apply at least two coats of waterproofing beneath the tiles to stop salt water seeping into the base.

Is levelling and waterproofing different on sea-facing balconies?

Yes, sea-facing balconies need precise levelling with a slight slope for drainage, and multi-layer waterproofing covering the base and edges. We use fine gravel mixed with treated concrete before laying the first waterproofing coat.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works