Bathroom tiling in Kuwait - Hateen

Bathroom tiling in Hateen

Bathroom tiling in Hateen requires precise substrate preparation and full waterproofing before tile fixing. We use first-grade adhesive and moisture-resistant grout to ensure the bathroom stays leak-free for many years.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most homes in Hateen are older and newer villas on medium-sized plots, with bathrooms ranging from tight to reasonably spacious. The substrate in these villas is a mix of plaster, brick or block, and some are damp at the base or have fine cracks. Before tiling we scrape the entire surface clean, dust it, and apply a comprehensive waterproofing layer covering the floor and walls up to at least 1.5 metres above the bathroom floor level.

Hateen lies in Hawalli governorate, a residential district of villas spread across regular plots near the main road.

We apply waterproofing to walls up to at least 150 cm above the bathroom floor before fixing any tile.

Back to Bathroom tiling

See also: Ceramic & porcelain tiling in Hateen

What the tiling work covers - Bathroom tiling

What the tiling work covers

Substrate preparation, waterproofing, tile fixing, grouting and a bathroom ready to use.

  • Substrate preparation

    Levelling floors and walls and removing loose or uneven surfaces before fixing.

  • Waterproofing layer

    Applying a membrane to floors and wall bases before any tile is set.

  • Tile fixing

    Setting ceramic or porcelain using adhesive suited to wet areas with even coverage.

  • Grouting and joints

    Filling joints with moisture-resistant grout and flexible sealant at corners and junctions.

  • Renovation retiling

    Stripping old tiles and fully retiling bathrooms in villas or apartments.

  • Final finishing

    Cleaning tiles and grout lines and checking levels before handover.

How it works.

  1. Call or whatsApp

    Contact us to describe the bathroom and arrange a site visit.

  2. Site inspection

    Measuring surfaces, assessing substrate condition and waterproofing needs.

  3. Tile selection and quote

    Confirming tile type, layout pattern and submitting the price offer.

  4. Tiling works

    Substrate prep, waterproofing, tile fixing and grouting in sequence.

  5. Check and handover

    Checking levels and grout lines and cleaning before handover.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom tiling in Hateen

Call now
Can new tiles be laid over old bathroom tiles?

No, old tiles must be removed completely. New tiles need a clean, properly adhered base, and laying over old tiles risks the new work falling or water seeping underneath.

What spacing between tiles and what grout type do you use?

We leave gaps of 3 to 5 mm between tiles depending on the tile size, and use epoxy or cement-based grout resistant to moisture and mould in bathrooms.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works