Bathroom retiling in Kuwait - Fintas

Bathroom retiling in Fintas

Fresh bathroom tiling in Fintas serves coastal villas and residential apartments near the sea. We remove worn tile, address salt and marine humidity damage, apply strong waterproofing, and install salt and moisture-resistant tile.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Fintas is a coastal district with villas and residential apartments near the seashore, and sea air carries salts and very high humidity. Tile in coastal bathrooms is quickly damaged by salt, which corrodes the mortar and cracks the tile itself. Removing old tile requires checking whether the concrete surface is also salt-damaged, and we may need to treat the surface with a salt-removal product before waterproofing. We use high-quality tile and salt-resistant mortar with a long-lasting waterproof membrane.

Fintas sits in Ahmadi governorate, a coastal district near Fintas Co-op and the seashore.

Tile in coastal areas needs salt treatment and high-durability waterproofing to resist marine humidity.

Back to Bathroom retiling

See also: Bathroom renovation in Fintas

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Fintas

Call now
Does sea salt speed up damage to tile and mortar?

Yes, greatly. Salt reacts with mortar and causes cracking and tile warping. That is why we use salt-resistant mortar and materials in coastal bathrooms.

Do we need special treatment of the concrete surface before waterproofing?

In coastal areas we check for salt damage to the surface. If we find salt deposits we use a salt-removal product before applying the waterproof membrane.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works