Bathroom retiling in Kuwait - Farwaniya

Bathroom retiling in Farwaniya

Fresh bathroom tiling in Farwaniya revives aging bathrooms in residential buildings. We remove cracked tile, seal the surface from moisture, and install durable tile with tight joints.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Farwaniya apartment buildings are mid-rise with identical units and standard-size bathrooms. The bathrooms are tight, with small floors and low walls, and aging plumbing often hides under the original tile. Removing old tile often exposes recurring seepage or concrete cracks, so we inspect carefully and install strong waterproofing before new tile. Precise levelling of new tile ensures water does not pool in bathroom corners.

Farwaniya is in Farwaniya governorate, a district of mid-rise residential buildings with aging, tight bathrooms.

Apartment bathrooms in Farwaniya typically measure no more than 1.5 metres wide by 2 metres long, requiring precision in levelling and tile layout.

Back to Bathroom retiling

See also: Bathroom renovation in Farwaniya

What the work covers - Bathroom retiling

What the work covers

Old tile removal, surface preparation, waterproofing and full retiling with quality materials.

  • Old tile removal

    Breaking out old tiles and adhesive bed without damaging the substrate.

  • Screed levelling

    Correcting floor slope toward the drain and levelling walls before tiling.

  • Junction waterproofing

    Applying waterproof membrane at floor edges and wall bases before tiling.

  • Floor and wall tiling

    Laying ceramic, porcelain or marble with precise alignment and level.

  • Grout and silicone

    Filling joints and sealing movement junctions with mould-resistant silicone.

  • Drain refitting

    Refitting the drain cover and trap flush with the finished tile surface.

How it works.

  1. Contact and survey

    Call or WhatsApp us to arrange an on-site bathroom survey.

  2. Material selection

    We help you choose the tile, format, grout colour and finish.

  3. Strip and prepare

    Old tiles removed, substrate levelled and waterproof membrane applied.

  4. Tiling and grouting

    New tiles laid, joints grouted and movement junctions sealed with silicone.

  5. Inspection and handover

    Slopes, joints and finish checked before we hand the bathroom back clean.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Bathroom retiling in Farwaniya

Call now
Why do old Farwaniya bathroom tiles often leak?

Aging plumbing and weak original waterproofing allow seepage through walls and floors. We remove old tile, repair concrete cracks, and install modern waterproofing before new tile.

How deep do we need to remove tile to find and fix leaks?

We remove all tile from floor and walls down to the concrete substrate. We inspect it for cracks and moisture, then apply waterproofing before new tile.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works