Apartment renovation in Kuwait - Mansouriya

Apartment renovation in Mansouriya

Apartment renovation in Mansouriya targets residential units in six- to eight-storey buildings built in the 1990s. We replace all floors, plasterwork and services, updating interior divisions to meet contemporary needs.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mansouriya apartments are spread across relatively tall buildings on standard plots around Fourth Ring Road, mostly three bedrooms or more with ceramic floors and painted walls. Horizontal services pass through shared intermediate slabs between units, so expanding the kitchen might affect common routes and requires coordination with the building management. Bathroom humidity sometimes penetrates the dividing walls, so we test ventilation and insulation, then repaint walls with moisture-resistant finishes before final completion.

Mansouriya lies in the Capital governorate on Fourth Ring Road, a densely built residential district.

Mansouriya buildings are six to eight storeys tall, with intermediate slabs about thirty centimetres thick containing shared service networks.

Back to Apartment renovation

What apartment renovation covers - Apartment renovation

What apartment renovation covers

Full or partial renovation of any apartment, addressing structure, finishes and all services.

  • Selective demolition and replanning

    Remove old finishes and non-structural partitions to suit the new layout.

  • Plumbing and drainage

    Replace or reroute concealed water supply and drainage lines inside the apartment.

  • Electrical works

    Update wiring, distribution board and lighting points to match the new fit-out.

  • Gypsum ceilings and paint

    Install gypsum ceilings hiding ducts, then apply climate-suitable paint systems.

  • Floors and wall finishes

    Lay tile, marble or parquet after waterproofing wet areas first.

  • Windows, doors and facade

    Replace aluminium frames, seal thermal gaps and refresh the apartment's external facade.

How it works.

  1. Call or whatsApp

    Contact us to book an on-site inspection of the apartment.

  2. Inspection and assessment

    We check services, finishes and document all defects found.

  3. Scope and quotation

    A detailed scope of work and clear itemised quote are submitted.

  4. Execution in sequence

    Services first, then finishes in the correct order.

  5. Inspection and handover

    Joint walkthrough before final handover of the apartment.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Apartment renovation in Mansouriya

Call now
Can we expand the kitchen by removing the wall to an adjacent empty room?

Yes, provided the wall is non-load-bearing and no shared services run through it. We check the building plans and contact the management to confirm, then remove the wall straightforwardly.

How do we fix humidity seeping from the bathroom into adjoining rooms?

We first test the bathroom ventilation, then install a strong exhaust fan and dehumidifier if absent. We then seal the dividing walls with moisture barriers and primer-resistant paint, which stops seepage.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works