Water tank installation in Kuwait - Salhiya

Water tank installation in Salhiya

Roof tank installation in Salhiya serves residential buildings and offices on standard plots in an active commercial zone. We fit the tank on the roof and conduct pressure and waterproof seal tests before finishing begins.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Salhiya is a commercial and residential hub where most buildings are five to ten storeys with large ground-level shops and apartments and offices above. This layout demands medium to large roof tanks to cover high consumption during business hours. We install the tank on a strong concrete base with multi-layer waterproofing and test it at full line pressure to confirm no leaks before tank walls are closed with stone or tile. Supply pipes travel through metal protective sleeves fixed to columns to prevent moisture and corrosion.

Salhiya sits in the Capital governorate, a district of commercial and residential centres near Sheraton Hotel.

Salhiya roof tanks require at least three hours of full pressure testing before handover to confirm no leakage.

Back to Water tank installation

What the service covers - Water tank installation

What the service covers

Roof tank supply and fit, from frame installation through to pressure testing and commissioning

  • Roof tank installation

    Tank secured to a steel frame sized for the roof slab.

  • Inlet and outlet connections

    PPR supply, draw-off and overflow lines run and fused.

  • Float valve fitting

    Level-control float valve fitted and adjusted to stop overflow.

  • Isolation valves

    Isolation valves on supply and draw-off lines for future maintenance.

  • Pressure test

    System filled and every joint checked before handover.

  • Old tank replacement

    Old tank removed, frame inspected and new tank installed.

How it works.

  1. First contact

    Call or WhatsApp us with photos of the roof and existing tank.

  2. Roof survey

    Technician inspects the roof, frame and existing pipework on site.

  3. Quotation

    Detailed quote covering tank, frame, pipe runs and connections.

  4. Installation

    Frame fixed, tank placed, PPR lines fused and valves fitted.

  5. Test and handover

    Tank filled, joints pressure-checked, float valve set and handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Water tank installation in Salhiya

Call now
How many times do you test the tank to confirm there are no leaks before handover?

We test the tank at least twice: once after installation and again before closing the tank walls with tile. Each test lasts three hours under full pressure with close monitoring for any pressure drop.

Can Salhiya commercial buildings share one tank for shops and apartments?

Yes, but the water supply must be divided between commercial and residential units with separate valves and independent meters to simplify billing and maintenance.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works