Water tank installation in Kuwait - Dasma

Water tank installation in Dasma

Roof tank installation in Dasma serves tall residential blocks closely spaced near downtown. We work with complex concrete roofs and tangled service runs, ensuring secure fixing with thorough pressure testing.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Dasma contains tall 10 to 15-storey residential blocks on relatively small plots, their roofs bearing loads from lifts and equipment vibration. Roof tanks here hold 30 to 50 cubic metres serving entire buildings, meaning heavy roof loads up to 5 to 7 tonnes. We check the original structural drawings and column layout under the slab, coordinating with the engineer to position fixing points directly over columns or main beams.

Dasma is in Kuwait governorate, a dense residential area close to Kuwait City centre.

We verify the main column grid below the slab before locating fixing points to ensure safe load distribution.

Back to Water tank installation

What the service covers - Water tank installation

What the service covers

Roof tank supply and fit, from frame installation through to pressure testing and commissioning

  • Roof tank installation

    Tank secured to a steel frame sized for the roof slab.

  • Inlet and outlet connections

    PPR supply, draw-off and overflow lines run and fused.

  • Float valve fitting

    Level-control float valve fitted and adjusted to stop overflow.

  • Isolation valves

    Isolation valves on supply and draw-off lines for future maintenance.

  • Pressure test

    System filled and every joint checked before handover.

  • Old tank replacement

    Old tank removed, frame inspected and new tank installed.

How it works.

  1. First contact

    Call or WhatsApp us with photos of the roof and existing tank.

  2. Roof survey

    Technician inspects the roof, frame and existing pipework on site.

  3. Quotation

    Detailed quote covering tank, frame, pipe runs and connections.

  4. Installation

    Frame fixed, tank placed, PPR lines fused and valves fitted.

  5. Test and handover

    Tank filled, joints pressure-checked, float valve set and handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Water tank installation in Dasma

Call now
How do you handle high-rise building roofs already bearing heavy loads from lifts and equipment?

We review the original engineering drawings and structural calculations, locating main columns and beams below the roof. We then recommend positioning the tank directly over these primary elements for precise load distribution.

Do large tanks (40 cubic metres and above) need additional metal support frames?

Often yes. We calculate the expected load and available area, and if direct fixing points prove insufficient or unsafe, we install additional metal frame bracing to distribute the load across a wider roof area.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works