Sewage pump installation in Kuwait - Wafra Agricultural

Sewage pump installation in Wafra Agricultural

Sewage pump installation in Wafra Agricultural addresses drainage from farms and fixed facilities. We assess wastewater loads from agricultural and livestock operations and install high-capacity pumps.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Wafra Agricultural comprises fields, greenhouses and poultry farms across large areas, with fixed facilities for crop processing and livestock rearing. Wastewater from these operations carries high organic loads from feed residues, animal waste and agricultural water, requiring high-capacity pumps with strainers or filters to prevent pipe clogging. Collection pits in this agricultural zone are deeper and wider than residential ones and need periodic maintenance to remove sediment and solids.

Wafra Agricultural lies in Ahmadi governorate, a broad agricultural zone with farms and livestock facilities.

Agricultural pumps in Wafra start at 2 kilowatts minimum, with discharge lines 100 to 150 millimetres diameter to handle heavy wastewater.

Back to Sewage pump installation

See also: Water pump install & service in Wafra Agricultural

What the installation covers - Sewage pump installation

What the installation covers

Site assessment and pump sizing through to discharge pipework, controls, and final test

  • Sump and drain survey

    Measuring sump depth, discharge diameter, and invert level to the public sewer

  • Pump selection

    Matching flow rate and head to the actual sewage volume and lift height

  • Pump fitting

    Lowering the submersible unit, securing the lifting chain, and connecting the discharge hose

  • Discharge line and check valve

    Running uPVC discharge pipe with a check valve to stop sewage flowing back into the sump

  • Controls and float switch

    Fitting the automatic float switch and electrical protection panel for safe auto-start

  • Commissioning test

    Flooding the sump to verify start, stop, and alarm levels before handover

How it works.

  1. Call or whatsApp

    Describe the sump location and reason so we can schedule a site visit

  2. Site survey

    We measure the sump, map the discharge route, and specify the correct pump

  3. Quotation

    A clear quote covering the pump, pipework, and electrical connection is provided

  4. Installation

    Pump is fitted, discharge line run, float switch and control panel connected

  5. Test and handover

    Full start-stop cycle is tested and the system handed over running independently

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Sewage pump installation in Wafra Agricultural

Call now
How do we size a pump for a large poultry facility?

We calculate wastewater volume from bird numbers and daily operations, then select a pump rated for the expected daily flow, typically 2 to 5 kilowatts depending on facility size.

Do we need a strainer or filter before the pump at an agricultural facility?

Yes, it is essential. We install a mechanical strainer at the pit opening or intake line to filter solids, vegetation and sediment before they reach the pump, preventing blockages and failures.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works