Sewage pump installation in Kuwait - Hassawi

Sewage pump installation in Hassawi

Sewage pump installation in Hassawi serves villas and mid-rise apartment buildings on medium plots where the drainage pit sits below ground level. We determine pump location, pipework bore, and automatic controls for safe, reliable discharge.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Hassawi comprises older villas and mid-rise apartment flats on medium-sized plots, often where the pit level sits below the main street. We install a submersible pump in an underground concrete chamber with 2 to 3-inch lifting pipework, a non-return valve, and automatic control panels. A common challenge here is siting the chamber within municipal setbacks and plot boundaries, especially when the plot is already congested with existing utilities.

Hassawi sits in Farwaniya governorate, a district of villas and apartment flats on medium plots at moderate heights.

Pump chambers in Hassawi are built with a minimum internal height of 1.2 metres to allow routine maintenance and cleaning access.

Back to Sewage pump installation

See also: Water pump install & service in Hassawi

What the installation covers - Sewage pump installation

What the installation covers

Site assessment and pump sizing through to discharge pipework, controls, and final test

  • Sump and drain survey

    Measuring sump depth, discharge diameter, and invert level to the public sewer

  • Pump selection

    Matching flow rate and head to the actual sewage volume and lift height

  • Pump fitting

    Lowering the submersible unit, securing the lifting chain, and connecting the discharge hose

  • Discharge line and check valve

    Running uPVC discharge pipe with a check valve to stop sewage flowing back into the sump

  • Controls and float switch

    Fitting the automatic float switch and electrical protection panel for safe auto-start

  • Commissioning test

    Flooding the sump to verify start, stop, and alarm levels before handover

How it works.

  1. Call or whatsApp

    Describe the sump location and reason so we can schedule a site visit

  2. Site survey

    We measure the sump, map the discharge route, and specify the correct pump

  3. Quotation

    A clear quote covering the pump, pipework, and electrical connection is provided

  4. Installation

    Pump is fitted, discharge line run, float switch and control panel connected

  5. Test and handover

    Full start-stop cycle is tested and the system handed over running independently

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Sewage pump installation in Hassawi

Call now
Can the pump chamber be hidden underground without protruding above ground?

Yes, the chamber is fully underground with a metal or concrete cover flush with ground level. However, small ventilation and access openings must be left for inspection and maintenance.

Does the automatic control prevent the pit from flooding?

The float switch starts the pump when water rises to a set level and stops it when it drops. However, if power cuts out or the pump fails, periodic checks are needed to prevent overflow.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works