Roof-tank pump installation in Kuwait - Qibla

Roof-tank pump installation in Qibla

Roof tank pump installation in Qibla covers full site survey, design, mounting and commissioning. We size the pump to the tank volume, required pressure and floor count, then fit all piping, valves and meters to code.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Qibla buildings range from mid-rise residential apartments to mixed commercial-residential on medium plots. Most have roof tanks mounted on slab, with service lines running through building columns or external walls. A new pump install requires surveying the suction line from the ground tank and the discharge to the roof tank, ensuring the existing network is isolated before fitting the new pump and all circuit components.

Qibla is in Kuwait governorate near Gulf Road and Seif Palace area.

Most roof tanks in Qibla serve 4 to 6 floors at operating pressure of 2.5 to 3.5 bar.

Back to Roof-tank pump installation

See also: Water pump install & service in Qibla

What the installation covers - Roof-tank pump installation

What the installation covers

Pump survey through commissioning, covering every fitting the roof tank circuit needs.

  • Tank and pump survey

    Measuring tank volume, static head and required flow rate before selecting pump.

  • Pump selection

    Matching pump type and capacity to tank size and building height.

  • PPR pipework

    Running supply and return PPR lines with isolation valves at each junction.

  • Pressure vessel fitting

    Installing a matched pressure vessel to stabilise line pressure and reduce pump starts.

  • Electrical connection

    Wiring pump to control panel with thermal overload protection and proper earthing.

  • Commissioning and test

    Setting pressure switch cut-in and cut-out, then testing flow at every outlet.

How it works.

  1. Call or whatsApp

    Describe the pump fault, your location and tank size if known.

  2. Roof survey

    We visit to measure static head, inlet and outlet pipes and existing pipework condition.

  3. Quotation

    Detailed quote covering pump, pressure vessel, pipework and electrical connection.

  4. Installation

    Pump mounted on anti-vibration pads, PPR lines connected, electrical control wired.

  5. Commissioning and handover

    Pressure switch set, start and stop cycle tested, maintenance notes handed over.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Roof-tank pump installation in Qibla

Call now
How is the pump size chosen for our roof tank?

We calculate it from tank volume, floors served and required pressure. We also inspect the existing line, since narrow pipes or corrosion can reduce performance.

Must the old network be isolated before the new pump is fitted?

Yes, we isolate the old line at the ground tank and close its isolation valve. Then we install the new pump, piping, check valves and meters with full isolation before commissioning test.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works