Underground tank construction in Kuwait - Amghara

Underground tank construction in Amghara

Underground tank construction in Amghara combines deep desert excavation with robust reinforcement to withstand hydrostatic pressure. We extract dense sandy soil, pour the concrete frame precisely, apply comprehensive waterproofing, then backfill and test.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Amghara is an industrial and agricultural zone on the Jahra fringe with unstable desert sandy soil that may compress when excavated deeply. Plots are spread out and spacious, allowing heavy equipment for excavation and pouring. Groundwater may be near surface depending on season, and sandy soil permits rapid water seepage, so waterproofing demands precision and multiple layers.

Amghara lies in Jahra governorate near the industrial zone and private farms.

Sandy soil in Amghara requires controlled hydraulic pressure during excavation to prevent slumping of excavation walls.

Back to Underground tank construction

See also: Tank waterproofing & cleaning in Amghara

What the work covers - Underground tank construction

What the work covers

Full execution from excavation to a tank ready for filling and pump connection

  • Excavation and base prep

    Precise dig dimensions and a level blinding concrete base layer

  • Reinforced concrete shell

    Walls, floor and roof poured in sulphate-resistant reinforced concrete

  • Floor slope to sump

    Calculated slope toward the drain point for full drainage during cleaning

  • Interior and exterior waterproofing

    External membrane layer plus food-grade internal coating for drinking water

  • Access hatch and cover

    Sealed access hatch that blocks soil, insects and surface water entry

  • Pipe connection and testing

    Supply and drainage pipe tie-ins with a pressure test before backfilling

How it works.

  1. Call or whatsApp

    Describe your site location and basic tank requirements to our team

  2. Site visit

    We visit to measure, assess soil type and check equipment access

  3. Quote and design

    Detailed quote covering dimensions, materials and waterproofing specification

  4. Excavation and construction

    Dig, pour reinforced concrete, apply external membrane and interior coating

  5. Testing and handover

    Water-tightness test, backfill, pipe connections and formal handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Underground tank construction in Amghara

Call now
Does sandy soil affect underground tank construction?

Yes, sandy soil is unstable and collapses easily when excavated, so we use temporary side shoring and hydraulic pressure to stabilize soil during excavation and pouring.

What waterproofing is suitable for tanks in sandy soil?

We use multiple waterproofing layers of resistant cement and bituminous materials, then an external protective layer of compacted sand and gravel to prevent rainwater and surface runoff seepage.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works