Underground tank construction in Kuwait - Ahmadi Stables

Underground tank construction in Ahmadi Stables

Underground reinforced tanks at Ahmadi Stables serve animal and operational water needs. We excavate to account for groundwater levels, then build a reinforced concrete structure with thick walls that withstand soil and hydrostatic pressure.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Ahmadi Stables sits on a district of detached buildings with stables and open exercise areas on relatively wide plots. The soil is sandy with variable groundwater levels, requiring careful assessment before excavation to set tank depth and backfill type. Tanks here bear animal loads and repeated washing operations, so we use high-grade concrete and dense reinforcement to ensure long-term durability.

Ahmadi Stables is located in Ahmadi governorate, a district specializing in horse breeding and related agricultural operations.

We excavate Ahmadi tanks to depths between two-and-a-half and four metres depending on groundwater level and expected load.

Back to Underground tank construction

See also: Tank waterproofing & cleaning in Ahmadi Stables

What the work covers - Underground tank construction

What the work covers

Full execution from excavation to a tank ready for filling and pump connection

  • Excavation and base prep

    Precise dig dimensions and a level blinding concrete base layer

  • Reinforced concrete shell

    Walls, floor and roof poured in sulphate-resistant reinforced concrete

  • Floor slope to sump

    Calculated slope toward the drain point for full drainage during cleaning

  • Interior and exterior waterproofing

    External membrane layer plus food-grade internal coating for drinking water

  • Access hatch and cover

    Sealed access hatch that blocks soil, insects and surface water entry

  • Pipe connection and testing

    Supply and drainage pipe tie-ins with a pressure test before backfilling

How it works.

  1. Call or whatsApp

    Describe your site location and basic tank requirements to our team

  2. Site visit

    We visit to measure, assess soil type and check equipment access

  3. Quote and design

    Detailed quote covering dimensions, materials and waterproofing specification

  4. Excavation and construction

    Dig, pour reinforced concrete, apply external membrane and interior coating

  5. Testing and handover

    Water-tightness test, backfill, pipe connections and formal handover

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Underground tank construction in Ahmadi Stables

Call now
How do you handle groundwater levels when excavating the tank?

We conduct a geotechnical survey before excavation to establish groundwater level. If it is high, we install temporary drainage pipes or submersible pumps to manage water during construction and pouring.

Does the reinforced tank withstand animal loads and repeated operations?

Yes. We design the walls and floor with thickness and reinforcement suitable for animal loads and daily operations. We use moisture-resistant concrete and test the structure before handover.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works