Tank welding in Kuwait - Anjafa

Tank welding in Anjafa

Tank welding in Anjafa focuses on sealing joints in steel and composite-metal tanks in residential buildings and older apartment blocks. We inspect the entire tank, prepare the surface, weld cracks and seams, then pressure-test for leaks.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most buildings in Anjafa were built in the 1980s and 1990s and contain overhead or ground-level steel tanks aged 25 to 35 years. These tanks corrode from Gulf seawater and weather exposure, with leaks appearing at horizontal and vertical seams. We access the tank via a tight internal or external ladder, remove rust with wire brush and grinding, then weld with steel or aluminium rod depending on the tank's original material.

Anjafa sits in Hawalli governorate, an older residential district with multi-storey apartment blocks and overhead tanks on most rooftops.

Overhead steel tanks in Anjafa typically stand 2 to 3 metres high with a capacity of 10 to 20 cubic metres, with horizontal and vertical seams exposed to corrosion.

Back to Tank welding

See also: Tank waterproofing & cleaning in Anjafa

What the service covers - Tank welding

What the service covers

Full inspection, surface prep, welding and leak test matched to the tank material

  • Tank inspection

    Locate all cracks, splits and brittle zones before any welding begins

  • Drain and clean

    Empty the tank and clean the surface so the weld bonds correctly

  • Plastic welding

    Hot-air rod welding with matching filler rod seals each crack fully

  • Fibreglass repair

    Resin and glass-fibre mat layers restore structural strength at damaged areas

  • Pressure test

    Fill and hold test confirms all welds are watertight before handover

  • Fitting check

    Pipe connections and access covers inspected for tightness after welding

How it works.

  1. Contact us

    Call or WhatsApp us to describe the tank condition and symptoms

  2. Site inspection

    Technician visits to examine cracks and identify the tank material

  3. Quotation

    You receive a clear scope and price before any work starts

  4. Welding

    Tank drained, cleaned, cracks welded and test performed

  5. Handover

    Tank refilled and confirmed watertight before the team leaves

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Tank welding in Anjafa

Call now
How do you handle an old steel tank leaking from multiple points?

We inspect the tank inside and out to locate all leak sources, grind and brush around each point, weld cracks with the right steel rod, then pressure-test with water to ensure all seams hold.

Does tank welding require the tank to be completely empty?

Yes, the tank must be completely drained before any welding starts, as water interferes with the weld and poses a safety risk. After welding and testing, the tank is refilled.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works