Epoxy tank lining in Kuwait - Wafra

Epoxy tank lining in Wafra

Homes and farms in Wafra rely on large water storage tanks needing epoxy lining to protect drinking and irrigation water from contamination. We fully drain the tank, clean it to a bare surface, apply reliable epoxy, allow full cure, then refill and test.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Wafra is an agricultural and residential zone near the Saudi border, with farms and villages relying on large storage tanks to support agricultural and household use. The soil here is rich in salts and heavy minerals due to proximity to brackish groundwater, causing rapid concrete erosion and heavy deposits. Epoxy lining requires very thorough cleaning to remove mineral salts and accumulated organic deposits, and some tanks may need relatively strong acid treatment.

Wafra lies in Ahmadi governorate, a traditional agricultural zone near Wafra Co-op and the Saudi border.

Wafra agricultural tanks may exceed 100 cubic metres, and cleaning may take 3 to 4 days due to heavy mineral deposits.

Back to Epoxy tank lining

See also: Tank waterproofing & cleaning in Wafra

What the work covers - Epoxy tank lining

What the work covers

Work runs from full tank drainage through to a hold test before the supply is restored.

  • Draining and drying

    Full drainage followed by forced drying until the interior is moisture-free.

  • Mechanical surface keying

    Grinding or abrasive blasting opens concrete pores for strong epoxy bond.

  • Crack and void filling

    Epoxy filler mortar applied to all cracks and voids before the full coat.

  • Food-grade epoxy coat

    Minimum two coats of drinking-water-approved epoxy applied to all interior faces.

  • Curing period

    Tank remains out of service until the coating reaches full cure before filling.

  • Hold and tightness test

    Trial fill and visual inspection for any weeps before final pipe connections are made.

How it works.

  1. Contact and assessment

    Call or WhatsApp us to describe the tank and arrange an on-site inspection visit.

  2. Inspection and quote

    We inspect the interior, measure the tank and provide a clear written quote.

  3. Draining and prep

    Tank is drained, force-dried and mechanically keyed before any coating begins.

  4. Epoxy application

    Cracks are filled, then food-grade epoxy coats are applied in the correct sequence.

  5. Test and handover

    Trial fill confirms tightness, then the tank is handed over ready for normal service.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Epoxy tank lining in Wafra

Call now
Do heavy mineral deposits in Wafra affect lining quality?

Yes, mineral deposits prevent direct epoxy adhesion to concrete. We use relatively strong acid treatment to remove them completely, then high-pressure cleaning before final application.

Can a Wafra tank be used for both irrigation and drinking after lining?

Food-grade epoxy permits dual use, but it is better to keep separate tanks for potable water and agricultural water to avoid cross-contamination between uses.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works