Epoxy tank lining in Kuwait - Qasr

Epoxy tank lining in Qasr

Qasr residential tanks require regular epoxy sealing to prevent water leakage and internal rust. We fully drain the tank, apply food-grade epoxy coating, and run a hold test before restoring supply.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Qasr homes sit on medium-sized plots with overhead or ground-level tanks in standard sizes of 5 to 10 cubic metres. Jahra's groundwater is hard and mineral-rich, causing deposits and internal corrosion on steel and concrete walls. Epoxy coating stops the chemical reaction between water and minerals and seals against seepage through hairline cracks. Application requires full drainage, sand and power-tool cleaning, then spray and cure.

Qasr sits in Jahra governorate, where villas spread across plots fed by hard groundwater.

Qasr residential tanks typically range from 5 to 10 cubic metres and are mounted on the roof or buried beside the house.

Back to Epoxy tank lining

See also: Tank waterproofing & cleaning in Qasr

What the work covers - Epoxy tank lining

What the work covers

Work runs from full tank drainage through to a hold test before the supply is restored.

  • Draining and drying

    Full drainage followed by forced drying until the interior is moisture-free.

  • Mechanical surface keying

    Grinding or abrasive blasting opens concrete pores for strong epoxy bond.

  • Crack and void filling

    Epoxy filler mortar applied to all cracks and voids before the full coat.

  • Food-grade epoxy coat

    Minimum two coats of drinking-water-approved epoxy applied to all interior faces.

  • Curing period

    Tank remains out of service until the coating reaches full cure before filling.

  • Hold and tightness test

    Trial fill and visual inspection for any weeps before final pipe connections are made.

How it works.

  1. Contact and assessment

    Call or WhatsApp us to describe the tank and arrange an on-site inspection visit.

  2. Inspection and quote

    We inspect the interior, measure the tank and provide a clear written quote.

  3. Draining and prep

    Tank is drained, force-dried and mechanically keyed before any coating begins.

  4. Epoxy application

    Cracks are filled, then food-grade epoxy coats are applied in the correct sequence.

  5. Test and handover

    Trial fill confirms tightness, then the tank is handed over ready for normal service.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Epoxy tank lining in Qasr

Call now
Why does the tank rust inside so quickly in Qasr?

Jahra water is hard and mineral-rich, reacting with steel and concrete walls to cause deposits and corrosion. Food-grade epoxy coating isolates the minerals from the tank walls and halts the reaction.

How long does epoxy application take on a residential tank?

After full drainage and thorough sand and power-tool cleaning, the epoxy is sprayed and cured. Cure time depends on Jahra's temperature and humidity, and a hold test confirms integrity before supply is restored.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works