Epoxy tank lining in Kuwait - Mansouriya

Epoxy tank lining in Mansouriya

Mansouriya tanks buried beneath courtyards need precise epoxy sealing to prevent fresh water loss. We fully drain the tank, condition the interior lining, apply food-approved epoxy, and test seal integrity.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Most Mansouriya tanks are buried beneath residential complex courtyards, serving several buildings with capacities of 30 to 60 cubic metres. The damp surrounding soil causes gradual seepage through concrete cracks, especially in lower side walls. The epoxy layer provides a moisture and salt barrier from the soil side and maintains water purity on the user side. Application requires safe drainage of cleaning water and protection of surrounding areas.

Mansouriya is in the Capital governorate near Fourth Ring Road, a densely residential area.

Buried Mansouriya tanks require temporary water transfer to a mobile tanker during epoxy application.

Back to Epoxy tank lining

See also: Tank waterproofing & cleaning in Mansouriya

What the work covers - Epoxy tank lining

What the work covers

Work runs from full tank drainage through to a hold test before the supply is restored.

  • Draining and drying

    Full drainage followed by forced drying until the interior is moisture-free.

  • Mechanical surface keying

    Grinding or abrasive blasting opens concrete pores for strong epoxy bond.

  • Crack and void filling

    Epoxy filler mortar applied to all cracks and voids before the full coat.

  • Food-grade epoxy coat

    Minimum two coats of drinking-water-approved epoxy applied to all interior faces.

  • Curing period

    Tank remains out of service until the coating reaches full cure before filling.

  • Hold and tightness test

    Trial fill and visual inspection for any weeps before final pipe connections are made.

How it works.

  1. Contact and assessment

    Call or WhatsApp us to describe the tank and arrange an on-site inspection visit.

  2. Inspection and quote

    We inspect the interior, measure the tank and provide a clear written quote.

  3. Draining and prep

    Tank is drained, force-dried and mechanically keyed before any coating begins.

  4. Epoxy application

    Cracks are filled, then food-grade epoxy coats are applied in the correct sequence.

  5. Test and handover

    Trial fill confirms tightness, then the tank is handed over ready for normal service.

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Epoxy tank lining in Mansouriya

Call now
Does epoxy application interrupt water supply to the buildings?

Yes, full drainage is required, so we coordinate with the complex management to transfer water to a mobile tanker serving the buildings during the sealing and curing period.

How do you prevent epoxy seepage into soil cavities around the tank?

We inspect the tank's outer walls before application and fill any external voids or cracks with cementitious sealant. The interior epoxy layer provides the primary barrier, while sound concrete prevents external ingress.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works