Storm-water drainage in Kuwait - Zour

Storm-water drainage in Zour

Storm drainage in Zour serves power plants and heavy facilities surrounded by massive cooling towers. We build networks drawing water from hot aprons and heat exchangers to retention tanks away from reactor buildings.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Zour's facilities include power generation plants with tall cooling towers and concrete aprons around electrical transformers, fuel tanks and heavy equipment. Collected water can be hot from nearby cooling systems and carries mineral deposits and chemical residues from industrial surfaces. We design networks with thermally insulated pipes in areas near cooling towers, collection tanks with proper ventilation to cool water before discharge, and chemical filters to meet environmental and industrial standards.

Zour lies in Ahmadi governorate, a heavy industrial zone with power generation and water desalination plants.

Drainage water from cooling stations must cool to at least 40 degrees Celsius before final discharge.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Zour

Call now
How do you handle high temperatures from nearby cooling systems?

We install thermally insulated pipes in hot zones and collection tanks with broad ventilation to cool water naturally before discharge. We monitor temperature continuously.

Do you treat chemical and mineral deposits from industrial surfaces?

Yes, we use advanced chemical filters and long-term retention tanks to allow deposits to settle before discharge. This ensures environmental standard compliance.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works