
Storm-water drainage in Rai Industrial
Storm drainage in Rai Industrial serves warehouses, workshops and large open yards across vast spaces. We design channels and collection tanks to handle heavy water loads from metal roofs and extensive asphalt floors.
- Licensed company
- Turnkey builds
- Pay in instalments
- All 6 governorates
What sets this area apart
Most Rai Industrial facilities are warehouses with high metal roofs and workshops with concrete floors, covering very large areas. Metal roofs shed enormous water volumes in short seasonal rains, and paved yards need robust surface channels. We design networks with main pipes of 250 mm bore or larger, with intermediate collection tanks to ease pressure on the city's main drainage system.
Rai Industrial lies in Farwaniya governorate, adjacent to major retail and a main thoroughfare.
Surface drainage channels are typically 600 mm to 800 mm deep to absorb fast loads from large roof areas.

What the service covers
Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

Storm-drain network design
Drainage drawings with calculated pipe grades, diameters and catchment areas

Rooftop collection channels
Roof gutters and parapet outlets directing water to vertical downpipes

Vertical downpipe runs
uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

Ground-level sumps and gullies
Gully pots and sump chambers with sediment traps at ground level

Connection to storm outlet
Tying the network to the approved discharge point or retention pit

Flow test and commissioning
Water-flow test confirming fall and clear passage before backfilling or plastering
How it works.
First contact
Call or WhatsApp us describing the site, its size and the drainage problem
Site survey
We visit to measure catchment areas, note levels and find existing buried services
Design and quote
We produce a drainage network drawing with a fully itemised price proposal
Installation and testing
Full network is installed, water-tested and confirmed clear before any closure
Handover
Site is handed over with maintenance notes for chambers and channel grates
Why one contractor beats four.
Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.
Turnkey
Shell and finishing with one company, from footings to keys.
Pay in instalments
Construction and finishing on instalments. Ask us for the details.
Engineering supervision
Architectural drawings and engineering supervision on site.
After handover
Maintenance contracts and a 24-hour emergency plumber.
A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.
What our clients say.
See all reviews on GoogleExcellent
Taha Saad
Google review
Excellent
Ali Nadi
Google review
More areas for Storm-water drainage
Other services in Rai Industrial
Questions about Storm-water drainage in Rai Industrial
Call nowHow often do intermediate collection tanks need cleaning?
Once before the rain season and once after, depending on debris buildup. We install sand drains and metal screens to reduce how often tanks need cleaning.
Can the network handle consecutive rain over several days?
Yes, we size intermediate tanks to drain down over at least 48 hours before refilling, allowing the system to recover between successive rain waves.
Licensed and registered in Kuwait.
Check us before you sign. This is our licence number and what it covers.
Find us on Google Maps