Municipal sewer connection in Kuwait - Rai Industrial

Municipal sewer connection in Rai Industrial

Municipal sewer connection in Rai Industrial serves warehouses and factories on large plots in a developed industrial zone. We run the private drain line from the facility to the public manhole, accounting for heavier industrial discharge loads.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Industrial plots in Rai are large and deep, ranging from 50 to 100 metres, with light steel-frame structures or reinforced concrete buildings. Public lines run under main roads at a consistent depth, and connection requires treatment of discharge if it contains oils or chemicals. We excavate carefully around existing pipes and cables, and install grease traps or treatment tanks before the drain enters the public network.

Rai Industrial sits in Farwaniya governorate, adjacent to The Avenues Mall, with robust municipal services.

Most industrial plots in Rai have a primary public sewer line running directly in front of the frontage.

Back to Municipal sewer connection

What the service covers - Municipal sewer connection

What the service covers

We run the private drain line out to the public manhole, test and reinstate

  • Connection survey

    Locating the public manhole and planning the pipe route

  • Trench excavation

    Cutting the trench to adequate depth without disturbing nearby foundations

  • uPVC pipe run

    Laying uPVC drain pipe on a sand bed with continuous fall to the network

  • Intermediate chamber

    Setting an inspection chamber at bends and at required inspection intervals

  • Public manhole entry

    Coring the manhole wall and sealing the connection with hydraulic mortar

  • Flow test and backfill

    Running a water flow test before backfilling the trench in compacted layers

How it works.

  1. First contact

    Call or WhatsApp us describing the building location and connection need

  2. Site survey

    Our engineer visits to locate the public manhole and plan the route

  3. Quotation

    A detailed quote covering excavation, pipes, chambers and reinstatement is issued

  4. Works and testing

    We excavate, lay pipe, connect to manhole and flow-test before backfilling

  5. Backfill and handover

    Trench is compacted in layers, surface reinstated and site handed over clean

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Municipal sewer connection in Rai Industrial

Call now
Do we need a grease trap before connecting drainage from a restaurant or food factory?

Yes, grease traps are mandatory for any drainage source containing oils or fats. We install them close to the source and test them before connection to the public network.

How do we connect if the building sits well below the manhole depth?

We install a small lift station inside the building to collect the drainage and pump it gradually up to the higher public manhole.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works