Storm-water drainage in Kuwait - Mishref

Storm-water drainage in Mishref

Storm drainage in Mishref serves villas and apartment blocks on relatively spacious plots with varying natural slopes. We design the outlet routes and underground retention tanks to handle seasonal rains and discharge toward the public network without water pooling around foundations.

  • Licensed company
  • Turnkey builds
  • Pay in instalments
  • All 6 governorates

What sets this area apart

Mishref plots have varying natural slopes running north to south, affecting groundwater and surface water flow patterns. The villas and smaller apartment buildings here need carefully designed drainage networks starting from roofs and paved areas and ending in infiltration tanks or municipal network connections. We review the natural ground level and existing foundations before deciding pipe depth and diameter, because any miscalculation means water pooling during the rainy season.

Mishref is in Hawalli governorate near Kuwait University, a district of villas and small apartment blocks on spacious plots.

Natural ground slope in Mishref ranges from 1 to 3 percent, which requires outlet pipes laid on a gradual incline.

Back to Storm-water drainage

What the service covers - Storm-water drainage

What the service covers

Full storm-drain networks designed, installed and commissioned for buildings, rooftops and paved areas

  • Storm-drain network design

    Drainage drawings with calculated pipe grades, diameters and catchment areas

  • Rooftop collection channels

    Roof gutters and parapet outlets directing water to vertical downpipes

  • Vertical downpipe runs

    uPVC or HDPE downpipes fixed to facades with sealed, expansion-jointed connections

  • Ground-level sumps and gullies

    Gully pots and sump chambers with sediment traps at ground level

  • Connection to storm outlet

    Tying the network to the approved discharge point or retention pit

  • Flow test and commissioning

    Water-flow test confirming fall and clear passage before backfilling or plastering

How it works.

  1. First contact

    Call or WhatsApp us describing the site, its size and the drainage problem

  2. Site survey

    We visit to measure catchment areas, note levels and find existing buried services

  3. Design and quote

    We produce a drainage network drawing with a fully itemised price proposal

  4. Installation and testing

    Full network is installed, water-tested and confirmed clear before any closure

  5. Handover

    Site is handed over with maintenance notes for chambers and channel grates

Call now

Why one contractor beats four.

Every extra contractor means another schedule and another excuse. With us, one company answers for all of it.

  1. Turnkey

    Shell and finishing with one company, from footings to keys.

  2. Pay in instalments

    Construction and finishing on instalments. Ask us for the details.

  3. Engineering supervision

    Architectural drawings and engineering supervision on site.

  4. After handover

    Maintenance contracts and a 24-hour emergency plumber.

Call now

A licensed Kuwaiti company for building construction, finishing, renovation and infrastructure works.

What our clients say.

See all reviews on Google

Questions about Storm-water drainage in Mishref

Call now
What if our plot sits low or flat and does not drain naturally?

We install an underground collection tank and fit a submersible pump to discharge water to the public network or higher ground. This solution is common in Mishref when natural slope is insufficient.

Is an infiltration tank enough or do we need underground pipes as well?

A tank alone suits sandy, dry soil, but most Mishref plots need drainage pipes connected to the tank to speed water absorption and reduce seasonal flood risk.

Have a plot, or a house to renovate?

Call or send a WhatsApp message and tell us about your project.

Licensed and registered in Kuwait.

Check us before you sign. This is our licence number and what it covers.

Find us on Google Maps
Licence no.2024/23054
  • Building construction
  • Building finishing
  • Renovation
  • Infrastructure works